manualshive.com logo in svg
background image

- 20 -

GB

Strabuc 918 and Strabuc 930

PIC. 3

OPTIONAL ACCESSORIES FOR COMPLETE INSTALLATION

230 V - 50 Hz

List of all operative accessories available:

  1 - Miri 4 Led flashing light
  2 - Elpro S40 electronic programmer with Siti 63 radio receiver
  3 - Thermomagnet differential switch with sensitivity 0,03 A (not provided)
  4 - Two-channel metal mass detector
  5 - Voltage stabilizer for each single solenoid/electro-valve coil
  6 - Anti-intrusion cabinet
  7 - Fit 55 recess-mounted photoelectric cell receiver
  8 - Pre-assembled magnetic loop with power supply cable
  9 - Post for Fit 55 photoelectric cell projector
10 - Strabuc 918 or Strabuc 930 oil-hydraulic traffic control post
11 - Siti 63 Transmitter
12 - Post for Fit 55 photoelectric cell receiver
13 - Visual 344 control accessory housing post
14 - Chis 37 key switch
15 - Post moving hazard-warning indicator
16 - Recess-mounted Fit 55 photoelectric cell projector
17 - Two-light traffic lights
18 - Birio A8 wall-mounted aerial
19 - Strabuc housing to be cemented into the ground (standard issue)

Содержание Strabuc 918

Страница 1: ...I Libretto di istruzioni GB Instructions manual F Notices de montage Strabuc 918 EN 13241 EN 12453 EN 12445 made in Italy thegateopener Strabuc 930 GB Instructions Manual pages 17 32 17...

Страница 2: ...work must be performed by authorised qualified technicians This operator has been designed for the use described in this manual only and using at least the safety control and indication accessoriesas...

Страница 3: ...solenoid valve Optional on request Release solenoid valve Optional on request the column lowers completely in blackout conditions M8x20 TSEI inox screw Strabuc 930 heavy armoured Plastic plug to cover...

Страница 4: ...il 6 Anti intrusion cabinet 7 Fit 55 recess mounted photoelectric cell receiver 8 Pre assembled magnetic loop with power supply cable 9 Post for Fit 55 photoelectric cell projector 10 Strabuc 918 or S...

Страница 5: ...range a 20 cm deep layer of pebbles for rainwater drainage It is important that once the cylindrical container has been placed on the pebbles the upper portion is flush with the ground level INSTALLAT...

Страница 6: ...to the 230 Volt power supply 1 Raise the post about 20 cm 2 and switch off the power supply 3 Pic 7 N B We recommend to fit a 20 F capacitor in parallel to the two phase live wires to give the traffic...

Страница 7: ...cylinder holes with those in the cylindrical container cemented into the ground Pull the electric cables to the Elpro S40 programmer without tugging For distances greater than 10 metres make extensio...

Страница 8: ...ehicles It prevents the traffic post from rising when vehicles pass over the coils A hole must be prepared see relative instruction sheet Specifications should always be observed for correct magnetic...

Страница 9: ...een designed for the installation of possible control accessories such as intercom systems or key switches in the immediate vicinity of the traffic post pic 12 ARRANGEMENT OF VISUAL 344 Visual 344 275...

Страница 10: ...wered 230 V to terminals 60 61 on the plug in card ELECTRICAL CONNECTIONS TO THE ELPRO S40 CONTROL BOARD Red Yellow Green Common Power supply 230 V 50 Hz 1 A fuse CONNECTOR FOR 3 LIGHT TRAFFIC LIGHTS...

Страница 11: ...should move up on the first commanding pulse should it fail disconnect power supply and swap the connections to the live terminals Strabuc n 1 common Strabuc n 1 Strabuc 918 or Strabuc 930 with soleno...

Страница 12: ...mand impulse RELEASE OPERATIONS FOR MANUAL LOWERING OF THE STRABUC 930 HEAVY ARMOURED Strabuc 930 Heavy Armoured posts can be lowered manually by following the operations shown in picture 22 Insert an...

Страница 13: ...support it Unscrew the Cap protecting the Armoured lock barrel using the triangular profile key Remove the three Eyebolts the post Cover the Rubber edge and the Drilled flange Unscrew the three long...

Страница 14: ...rash resistance 280 000 J 45 000 J 410 000 J Strabuc 918 Static load resistance The static load acting on the Strabuc 918 when completely lowered is considered as the weight a 20 000 kg lorry exerts w...

Страница 15: ...RABUC 918 GB Date 10 01 14 The Responsible Manager Responsible Manager made in Italy the gate opener DECLARATION OF CONFORMITY of the Manufacturer Manufacturing company Model Strabuc 930 and Strabuc 9...

Страница 16: ...utput 0 25 kW 0 33 HP Power consumption 330 W Power supply voltage 230 V Frequency 50 Hz Absorbed current 1 8 3 5 A 6 A max Motor rotation speed 2 800 rpm Intermittent service S3 CYLINDRICAL CONTAINER...

Отзывы: