background image

- 23 -

GB

Strabuc 918 and Strabuc 930

6)

7)

Strabuc 930

Heavy Armoured

Strabuc 930

Heavy Armoured

M10x30 hexagonal
head screws

Cover

Rubber edge

Drilled flange
for edge tightening

Eyebolt

Eyebolt

Corrugated
flexible tube

about 6 - 8 metres

Pebble drainage layer

Cylindrical

container

to becemented

into the ground

Eyebolt

Retractable
post

Manual release
cover security flap

PIC. 9

PIC. 10

ATTENTION: as Strabuc 918 or Strabuc 930 come complete with a series of electric cables, each one 10 metres long, during all these
traffic post installation operations, never tug at or charge electric wires for any reason. During Strabuc 918 or Strabuc 930 maintenance
or removal operations DO NOT CUT THE ELECTRIC WIRES, remove them from the pipes.

Align the traffic post cylinder holes
with those in the cylindrical container
cemented into the ground.

Pull the electric cables to
the Elpro S40 programmer
without tugging

For distances greater than 10 metres, make extensions using seale
djunction boxes inside an accessible dividing box.

Below ground wiring housed inside

a corrugated pipe

Elpro S40

1 - Limit switches

Junction
boxes

Seal the junction boxes

using bands

2 - Power supply 230 V
3 - LED and buzzer power (optional)
4 - Solenoid valve (optional)

ATTENTION: measure the distance between the traffic post installed and the Elpro S40 programmer: once the Strabuc has been
positioned and fastened, all the electric cables must rest freely on the bottom of the cylindrical housing. If the distance is greater, the
wires should be extended using sealed joints (junction boxes) inside an accessible dividing box, according to good installation practice:
this will prevent malfunctions and will guarantee efficient operation over time.

Содержание Strabuc 918

Страница 1: ...I Libretto di istruzioni GB Instructions manual F Notices de montage Strabuc 918 EN 13241 EN 12453 EN 12445 made in Italy thegateopener Strabuc 930 GB Instructions Manual pages 17 32 17...

Страница 2: ...work must be performed by authorised qualified technicians This operator has been designed for the use described in this manual only and using at least the safety control and indication accessoriesas...

Страница 3: ...solenoid valve Optional on request Release solenoid valve Optional on request the column lowers completely in blackout conditions M8x20 TSEI inox screw Strabuc 930 heavy armoured Plastic plug to cover...

Страница 4: ...il 6 Anti intrusion cabinet 7 Fit 55 recess mounted photoelectric cell receiver 8 Pre assembled magnetic loop with power supply cable 9 Post for Fit 55 photoelectric cell projector 10 Strabuc 918 or S...

Страница 5: ...range a 20 cm deep layer of pebbles for rainwater drainage It is important that once the cylindrical container has been placed on the pebbles the upper portion is flush with the ground level INSTALLAT...

Страница 6: ...to the 230 Volt power supply 1 Raise the post about 20 cm 2 and switch off the power supply 3 Pic 7 N B We recommend to fit a 20 F capacitor in parallel to the two phase live wires to give the traffic...

Страница 7: ...cylinder holes with those in the cylindrical container cemented into the ground Pull the electric cables to the Elpro S40 programmer without tugging For distances greater than 10 metres make extensio...

Страница 8: ...ehicles It prevents the traffic post from rising when vehicles pass over the coils A hole must be prepared see relative instruction sheet Specifications should always be observed for correct magnetic...

Страница 9: ...een designed for the installation of possible control accessories such as intercom systems or key switches in the immediate vicinity of the traffic post pic 12 ARRANGEMENT OF VISUAL 344 Visual 344 275...

Страница 10: ...wered 230 V to terminals 60 61 on the plug in card ELECTRICAL CONNECTIONS TO THE ELPRO S40 CONTROL BOARD Red Yellow Green Common Power supply 230 V 50 Hz 1 A fuse CONNECTOR FOR 3 LIGHT TRAFFIC LIGHTS...

Страница 11: ...should move up on the first commanding pulse should it fail disconnect power supply and swap the connections to the live terminals Strabuc n 1 common Strabuc n 1 Strabuc 918 or Strabuc 930 with soleno...

Страница 12: ...mand impulse RELEASE OPERATIONS FOR MANUAL LOWERING OF THE STRABUC 930 HEAVY ARMOURED Strabuc 930 Heavy Armoured posts can be lowered manually by following the operations shown in picture 22 Insert an...

Страница 13: ...support it Unscrew the Cap protecting the Armoured lock barrel using the triangular profile key Remove the three Eyebolts the post Cover the Rubber edge and the Drilled flange Unscrew the three long...

Страница 14: ...rash resistance 280 000 J 45 000 J 410 000 J Strabuc 918 Static load resistance The static load acting on the Strabuc 918 when completely lowered is considered as the weight a 20 000 kg lorry exerts w...

Страница 15: ...RABUC 918 GB Date 10 01 14 The Responsible Manager Responsible Manager made in Italy the gate opener DECLARATION OF CONFORMITY of the Manufacturer Manufacturing company Model Strabuc 930 and Strabuc 9...

Страница 16: ...utput 0 25 kW 0 33 HP Power consumption 330 W Power supply voltage 230 V Frequency 50 Hz Absorbed current 1 8 3 5 A 6 A max Motor rotation speed 2 800 rpm Intermittent service S3 CYLINDRICAL CONTAINER...

Отзывы: