Centerline of
gate leaf

Gate post

Axis of rotation
of gate leaf

Mounting box: 
10 1/4 x 19 1/4 in.
(26 x 49 cm)

Cement surrounding the
mounting box or cement footing
to which box is attached

Figure 7. The orientation of the load bearing box and concrete when you
secure the load bearing box

You next need to test fit the load bearing box in the
cavity. The fit must meet the following requirements:

1.

 

The center of the splined shaft of the  pinion
must align perfectly with the axis of rotation for
the gate leaf. 

Use a plumb line to insure this

vertical alignment

.

2.

 

The cover of the load bearing box should be
even with the finished grade beneath the gate,
but more importantly, the top edges of the load
bearing box must be level. 

Use a level to insure

this horizontal alignment

.

Secure the Load Bearing Box

Next you need to fix the mounting box in place if it
meets all the requirements for alignment. Precisely how
you fix the box in place will vary according to your soil
conditions and your installation site.

Example

: For example, you might surround the exterior

of the mounting box with enough soil to extend 1/2 way
up the box

so that soil covers the access holes for the

electrical conduit and drainage pipe. While such soil
should be firmly packed around the box, you have to be
sure that in packing the soil you do not misalign the
center of the splined shaft of the pinion or the top edge
of the box. In fact, you should recheck all alignments
and adjust the mounting box if necessary. Then you can
pour concrete around the box and up to its top edge so
as to be level with the finished grade beneath the gate
leaf.

Example

: As another example, you might use a

foundation plate set in a cement footing. Then you could
bolt the mounting box to the plate, taking care that your
bolts do not interfere with the 760 Operator yet to be
installed in the box. This method requires you to
compensate for the unevenness of the bottom of the
mounting box.

Note

: No matter what your method of fixing the

mounting box in place, use sufficient concrete to hold
the mounting box in place when it is under the stresses
inherent in hydraulically swinging the gate.

No matter how you secure the mounting box, if you use
poured concrete, allow a minimum of two full days
before you install the 760 Operator inside the mounting
box.

Install the Gate Leaf Shoe

Note:  

Building a gate leaf shoe is not absolutely

necessary.  It is a method that will work in most
applications.  However, if you wish to weld the splined
collar directly to the gate or attach it by some other
means, feel free to do so.

Caution

: Do not install the gate leaf shoe, even for test

fitting, until any concrete beneath or around the
mounting box has had a chance to set for a minimum of
two full days.
If the vertical distance between the finished grade under
the gate and the bottom of the gate leaf is more than
2 3/8 in. (see Figure 4), you need to do one of the
following:

Содержание 760

Страница 1: ...oe 11 Install the Gate Leaf 14 Install the Operator in the Load Bearing Box 14 Install the 450 MPS Control Panel 16 Connect the Main Power Supply 16 Connect the Operator s to the Control Panel 17 Chec...

Страница 2: ...ough away from the road to eliminate the potential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fast the gate operates 2 The operator you...

Страница 3: ...the equipment 3 If a gate system component malfunctions turn off the main power before making any attempt to repair it 4 Do not attempt to impede the movement of the gate You may injure yourself as a...

Страница 4: ...t lb kg 1760 800 Maximum gate length ft m 7 2 1 10 3 13 4 Maximum angle of rotation deg 148 degrees 90 deg opening time sec 12 17 Nominal torque ft lb Nm 399 543 200 272 Your standard 220 VAC power so...

Страница 5: ...are included 760 Operator Figure 1 Hydraulic pump drive assembly with a plastic shipping cover fitted over the rack Package containing 4 bolts and 4 lock washers for attaching the 760 Operator to the...

Страница 6: ...ety of both people and property FAAC safety standards state that the gate should stop its movement if it encounters a force of more than about 33 lb The installer of the 760 Operator makes the necessa...

Страница 7: ...hem after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Opening Closes both leaves immediately Closes the leaf immediately Stops St...

Страница 8: ...1 No effect opening is inhibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer triggered No effect On O...

Страница 9: ...ate leaf has positive stops in both the opening and closing directions see Figure 5 Figure 5 Positive stops are required in the fully opened and fully closed gate positions 4 You need to determine a m...

Страница 10: ...toward the gate post for release Figure 6 The Manual Release in the 760 Standard Operator Installing the 760 Operator Installing the 760 Operator consists of the following steps Install the load bear...

Страница 11: ...d shaft of the pinion or the top edge of the box In fact you should recheck all alignments and adjust the mounting box if necessary Then you can pour concrete around the box and up to its top edge so...

Страница 12: ...the holes on the opposite sides of the pipes Figure 8 A sample shear pin assembly Axis of rotation within body of gate leaf Axis of rotation outside body of gate leaf Splined shaft Splined shaft slee...

Страница 13: ...d the splined collar into place on the bottom of the shoe s U shaped section If you are using the shear pin assembly spot weld the splined collar to the bottom of the shear pin assembly and spot weld...

Страница 14: ...erator see Figure 14 Be sure to keep track of the plugs and the rack and pinion covers in case you ever need to remove the operator for repair Pinion cover Mounting box cover Bolt 1 of 4 Figure 13 Rem...

Страница 15: ...and closing momentum completely before you operate the gate electrically The pressure valves are not preset at the factory and may operate the gate leaf with enough force to endanger people and serio...

Страница 16: ...ain power breaker switch and for making sure that the entire gate system meets all applicable electrical codes Follow the instructions that follow to install the 450 MPS control panel for the 760 Oper...

Страница 17: ...unction boxes depends on your gate design If any operator is more than 2 ft away from the U L Listed control panel enclosure the connection must be made inside a junction box Use a U L Listed cord gri...

Страница 18: ...The terminal strip wiring of the 450 MPS with photobeams Figure 21 Wiring detail a inside the junction box and b from the junction box or operator to the high voltage terminal strip on the 450 MPS co...

Страница 19: ...ns for installing such accessories follow Connect Other Devices WARNING Turn the main power off before you make any electrical connections or set any switches inside the control panel box Now you can...

Страница 20: ...20 Figure 22 Common accessories wired to 450 MPS...

Страница 21: ...en An electric lock can make use of the reversing stroke function controlled by DIP switch 5 A reversing stroke is a short closing phase that allows the electric lock time to disengage itself before t...

Страница 22: ...positive stop for opening and for closing Leaf Delay You may choose to delay one leaf on closing for overlapping gate leaves Be sure the operator on the leaf for delayed closing is connected to Motor...

Страница 23: ...en the brass lock nut Manually move the gate leaf to the fully opened position against the opened limit stop Loosen the brass lock nut for the opening brake adjustment bolt Next turn the square headed...

Страница 24: ...slide this hex head into the brass fitting of the 760 Operator that is located on the same end as the bypass valve adjustment screws see Figure 29 Brass gear assembly Plastic gear assembly Figure 25 A...

Страница 25: ...ing to Figure 30 Caution Do not weld anything to or on the inside of the sleeve of the splined shaft Next weld the outside of the sleeve for the splined shaft solidly to the inside of the hole in the...

Страница 26: ...se check once per year Heavy duty use check every 6 mo Rack and Pinion When you remove the 760 Operator from the mounting box to change the hydraulic oil grease the rack and the pinion Light duty use...

Страница 27: ...rs are running Solution Make sure that the motor is running in the right direc tion and make sure the Manual Release mechanism has fully engaged the hydraulic system Increase the bypass pressure in sm...

Страница 28: ......

Страница 29: ...UL strain relief kit 2167A 710914 710915 709020002 703930...

Страница 30: ......

Страница 31: ...t s or has been subject to misuse negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more se...

Отзывы: