Check the Motor’s  
Direction of Rotation 

After you have connected the main power supply, one 
activating device, and the operator(s) to the control 
panel, you need to check the direction of rotation for 
each operator motor in your gate design. 
 
To check a motor’s direction of rotation, you must have 
three closed circuits on terminal block J3. Install one 
circuit between terminals 11 and 13, another circuit 
between terminals 13 and 21, and another circuit (or 
stop device) between terminals 14 and 15.  
 
You cannot check the motor’s direction of rotation 
without these circuits (jumpers) or the accessories. 
When properly prepared for testing, the LEDs DL2 and 
DL3 should be illuminated. 

WARNING!

 Running the operator—even for 

testing purposes—without a connected 
reversing device is potentially dangerous. Do 
not place yourself within the path of the 
moving gate during your test. 

Disengage the operator(s) with the Manual Release key, 
and open the gate by hand about halfway.  
 
Next, engage the operator(s) with the Manual Release 
key so that you can check the rotation of the motor(s). 
 
Turn on the main power and send an activating signal to 
the operator. The gate leaf (or leaves) should open. If a 
gate leaf closes, then you need to turn off the main 
power and reverse the connection of the brown and 
black (or red and black) wires on terminal block J2 for 
the operator controlling that leaf. Then you need to 
recheck the rotation direction again. 
 
If your gate system has two operators, be sure the motor 
of each rotates in the correct direction. 
 
After having completed your test of the motor’s 
direction of rotation, replace any test circuits you 
installed (between terminals 11 and 13, between 13 and 
21, and between 14 and 15) with the proper reversing 

and stop devices. The instructions for installing such 
accessories follow. 

Connect Other Devices 

WARNING

! Turn the main power off before 

you make any electrical connections or set any 
switches inside the control panel box. 

Now you can connect additional reversing and activat-
ing devices to the control panel. Refer to Figure 13 for 
the general control panel layout, and refer to Figure 14 
for the layout of the terminal strip. 

Note

: The 450 MPS control panel allows a 

maximum accessory load of 500 mA. 

Power Supply for Accessories

: You can access a 30 

VDC output for supplying power to accessories that 
require DC voltage through terminals 9 and 10 (located 
above the label 

30 Vcc

) on terminal block J3. In most 

cases, this source can be used to power 24 VDC 
accessories.  
 

Reversing Devices

: Reversing devices include 

photocells, inductive loops, and so forth. All of the 
reversing devices should have contacts of the normally 
closed (N.C.) type. Where you connect a device 
depends on whether you want the device to operate 
during opening or during closing.  

Note

: UL 

does not 

recognize the FAAC 

system with loop detectors or safety edges. 
FAAC photocells must be used to comply with 
UL 325.  

Caution

: Failure of a reversing device that 

operates during opening causes a gate to lock 
in the closed position and requires the use of 
the manual key release. 

To wire photocells, refer to Figure 14 (see FSWOP for 
opening photocells, and FSWCL for closing photocells—
connect the photocells exactly as shown). See Figure 17 
for the wiring of inductive loops. In either case, if you 
have multiple devices, wire them in series.  

 

 
 
 

Содержание 750 Standard

Страница 1: ...the Drive Unit 12 Connect the Hydraulic Lines 12 Synchronize the Hydraulic System 13 Install the Gate Leaf Shoe 13 Install the Gate Leaf 15 Installing the Control Panel 15 Connect the Main Power Supp...

Страница 2: ...ortant that you locate the gate far enough away from the road to eliminate the potential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fas...

Страница 3: ...ipment observe some fundamental rules Do not touch the equipment with damp or humid hands or feet Do not install or operate the equipment with bare feet Do not allow small children or incapable person...

Страница 4: ...cluding shaft length width in cm 47 8 153 4 77 8 12 4 40 20 Weight 100 deg swing lb kg 180 deg swing lb kg 18 8 20 9 Oil quantity qt l 0 9 1 Maximum angle of rotation 100 deg swing deg 180 deg swing d...

Страница 5: ...ts base plate with 4 leveling bolts installed and with the sleeve fitted over the splined shaft 2 Box halves right angled and lipped pieces of galvanized steel that together form the sides of the box...

Страница 6: ...isengaged you can open and close the gate leaf by hand Such manual operation of the gate is necessary during installation and useful during power failures The two bypass valves are located on the fron...

Страница 7: ...them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Opening Closes both leaves immediately Closes the leaf immediately Stops S...

Страница 8: ...1 No effect opening is inhibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer triggered No effect On O...

Страница 9: ...50 Operator consists of the following steps Setting the concrete forms Installing the power unit Installing the drive unit Connecting the hydraulic lines Synchronizing the hydraulic system Installing...

Страница 10: ...x 18 in 25 4 x 45 7 cm Axis of rotation of gate leaf Gate post Minimum of 2 1 4 in 5 7 cm maximum of 5 1 4 in 13 3 cm One of 4 bolts that anchor plate into cement footing Figure 4 Recommended dimensio...

Страница 11: ...and then lift it off the box The vinyl hinges can now be placed in the hinge receptacles on the right hand side Secure the hinges with the screws provided You may surface mount the power unit box to...

Страница 12: ...e the necessary holes for the two hydraulic lines that run from the drive unit to the power unit Once you have made your access holes you can weld the box halves to the foundation plate and to one ano...

Страница 13: ...ruct a shear pin assembly to accommodate the extra vertical distance The assembly is welded to the bottom of the gate leaf shoe on one end and to the sleeve for the splined shaft of the pinion on the...

Страница 14: ...he bottom side of the U shaped section of the shoe as shown in Figure 10 On the bottom of the U shaped shoe section center the sleeve around the pilot hole that marks the axis or rotation Accurately c...

Страница 15: ...veling bolts on the base of the drive unit to correct any problems with the gate s travel Installing the Control Panel Locate the control panel in the most convenient position possible considering the...

Страница 16: ...anel box C 3 X 18 AWG 3 X 18 AWG 4 Main power switch D 5 X 18 AWG 5 X 18 AWG 5 Circuit breaker E 5 X 18 AWG 5 X 18 AWG 6 Main junction box F 4 X 14 AWG up 3 X 14 AWG up 7 Switch for 750 Operator to 41...

Страница 17: ...in block J1 and connect the power wires to the terminals labeled N neutral and L phase Caution The operators are grounded only by the grounded circuit the installer provides Connect One Activating Dev...

Страница 18: ...ystem has one operator connect the capacitor and the brown and black or red and black wires from your operator to the terminals 3 and 5 in block J2 for Motor 1 Connect the blue or white wire from the...

Страница 19: ...Panel U L Listed Control Panel Enclosure Cord grip or conduit from U L Listed gate operator s see text Ground Legend Red Black White Yellow Green a b J3 Figure 15 Wiring detail a inside the junction b...

Страница 20: ...the motor s direction of rotation replace any test circuits you installed between terminals 11 and 13 between 13 and 21 and between 14 and 15 with the proper reversing and stop devices The instructio...

Страница 21: ...J3 In addition terminal block J3 requires a fail safe connection for the photocells Connect the photocells to terminals 20 and 21 Activating Devices and Radio Receiver The acti vating devices and radi...

Страница 22: ...y when an activating signal is sent for 2 and 1 gate leaves respectively DL3 should be illuminated except when the stop button is pressed DL4 and DL5 should be illuminated except when the reversing de...

Страница 23: ...off EP on on off B on on on C off off on Switch 4 Reversing Device Behavior on Closing Refer to the operating logic tables later in these instructions and to the chart below for how to set DIP switch...

Страница 24: ...unit through the bleed screw holes see Fig ure 18 You need to bleed the hydraulic system before setting the gate up for normal operation To run the gate leaf through an open close cycle make sure the...

Страница 25: ...22 The location of the bleed screws on the drive unit top view WARNING The pressure the gate leaf applies to the obstruction is determined by the bypass valve adjustment It is the installer s respons...

Страница 26: ...the extension collar is affected by the overlap of the extension bar and extension U Attach the 750 extension collar to the bottom of the gate leaf with a 7 16 in 1 1 cm bolt Weld together the extens...

Страница 27: ...use check every 6 mo Check all reversing devices Every six months you should verify that all installed reversing devices work properly The Control Panel The control panel requires no maintenance Trou...

Страница 28: ...a reversing device is triggered If either does not illuminate then one of your reversing devices is preventing the gate from responding to your signal Check your reversing devices If no reversing dev...

Страница 29: ...use negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceedi...

Отзывы: