thick. The U-shaped section of the shoe must be a 
minimum of 5 3/4 in. (2.1 cm) long and must be as wide 
as the gate leaf is thick and must fit as tightly as 
possible to minimize leaf movement within the shoe 
(see Figure 11). 

 

Construct the U-shaped section of the shoe and verify 
that it fits around the gate leaf. Position the U-shaped 
section over the splined shaft so that the leaf's axis of 
rotation will fall within the minimum dimensions shown 
in Figure 11.  
 
On the U-shaped section of the shoe, mark the position 
for the leaf's axis of rotation. Next, drill a pilot hole in 

the U-shaped section to mark the axis of rotation point 
and mark the position for the placement of the vertical 
section of the shoe.  
 
Next you need to position the sleeve for the splined 
shaft of the pinion (or the shear-pin assembly) on the 
bottom side of the U-shaped section of the shoe as 
shown in Figure 10. On the bottom of the U-shaped 
shoe section, center the sleeve around the pilot hole that 
marks the axis or rotation. Accurately centering the 
pilot hole is important. 

Caution:

 

NEVER  

weld the splined shaft to 

anything. 

Axis of rotation 
within body of 
gate leaf

Axis of rotation 
outside body of  
gate leaf

Splined shaft

Splined shaft 
sleeve

U-shaped 
section of 
gate leaf 
shoe

Vertical  
section

Gate leaf

Gate leaf

Vertical 
section

 

Note

: The gate's axis of rotation may fall within or outside the body of the gate leaf. 

Figure 10. Parts of the gate leaf shoe 

Axis of rotation 
for gate leaf

Centerline of 
gate leaf

Vertical section can be 
located on either side 
of axis of rotation

Minimum of  
3/4 in. (1.9 cm) 

 
Recommended minimum of 10 in. (25 cm)

Thickness 
of the  
gate leaf

Bottom of 
U-shaped 
section

Absolute minimum of 5 in. (12.7 cm) 
between vertical section and end of 
U-shaped section

 

Figure 11. Top view of the U-shaped section of the gate leaf shoe

 

Содержание 750 Standard

Страница 1: ...the Drive Unit 12 Connect the Hydraulic Lines 12 Synchronize the Hydraulic System 13 Install the Gate Leaf Shoe 13 Install the Gate Leaf 15 Installing the Control Panel 15 Connect the Main Power Supp...

Страница 2: ...ortant that you locate the gate far enough away from the road to eliminate the potential of traffic getting backed up This distance is affected by the size of the gate how often it is used and how fas...

Страница 3: ...ipment observe some fundamental rules Do not touch the equipment with damp or humid hands or feet Do not install or operate the equipment with bare feet Do not allow small children or incapable person...

Страница 4: ...cluding shaft length width in cm 47 8 153 4 77 8 12 4 40 20 Weight 100 deg swing lb kg 180 deg swing lb kg 18 8 20 9 Oil quantity qt l 0 9 1 Maximum angle of rotation 100 deg swing deg 180 deg swing d...

Страница 5: ...ts base plate with 4 leveling bolts installed and with the sleeve fitted over the splined shaft 2 Box halves right angled and lipped pieces of galvanized steel that together form the sides of the box...

Страница 6: ...isengaged you can open and close the gate leaf by hand Such manual operation of the gate is necessary during installation and useful during power failures The two bypass valves are located on the fron...

Страница 7: ...them after pause time Opens single leaf connected to Motor 1 and closes it after pause time No effect No effect No effect Off Opening Closes both leaves immediately Closes the leaf immediately Stops S...

Страница 8: ...1 No effect opening is inhibited No effect opening is inhibited No effect opening is inhibited Off Opening Stops Stops Stops Stops gate closes when reversing device no longer triggered No effect On O...

Страница 9: ...50 Operator consists of the following steps Setting the concrete forms Installing the power unit Installing the drive unit Connecting the hydraulic lines Synchronizing the hydraulic system Installing...

Страница 10: ...x 18 in 25 4 x 45 7 cm Axis of rotation of gate leaf Gate post Minimum of 2 1 4 in 5 7 cm maximum of 5 1 4 in 13 3 cm One of 4 bolts that anchor plate into cement footing Figure 4 Recommended dimensio...

Страница 11: ...and then lift it off the box The vinyl hinges can now be placed in the hinge receptacles on the right hand side Secure the hinges with the screws provided You may surface mount the power unit box to...

Страница 12: ...e the necessary holes for the two hydraulic lines that run from the drive unit to the power unit Once you have made your access holes you can weld the box halves to the foundation plate and to one ano...

Страница 13: ...ruct a shear pin assembly to accommodate the extra vertical distance The assembly is welded to the bottom of the gate leaf shoe on one end and to the sleeve for the splined shaft of the pinion on the...

Страница 14: ...he bottom side of the U shaped section of the shoe as shown in Figure 10 On the bottom of the U shaped shoe section center the sleeve around the pilot hole that marks the axis or rotation Accurately c...

Страница 15: ...veling bolts on the base of the drive unit to correct any problems with the gate s travel Installing the Control Panel Locate the control panel in the most convenient position possible considering the...

Страница 16: ...anel box C 3 X 18 AWG 3 X 18 AWG 4 Main power switch D 5 X 18 AWG 5 X 18 AWG 5 Circuit breaker E 5 X 18 AWG 5 X 18 AWG 6 Main junction box F 4 X 14 AWG up 3 X 14 AWG up 7 Switch for 750 Operator to 41...

Страница 17: ...in block J1 and connect the power wires to the terminals labeled N neutral and L phase Caution The operators are grounded only by the grounded circuit the installer provides Connect One Activating Dev...

Страница 18: ...ystem has one operator connect the capacitor and the brown and black or red and black wires from your operator to the terminals 3 and 5 in block J2 for Motor 1 Connect the blue or white wire from the...

Страница 19: ...Panel U L Listed Control Panel Enclosure Cord grip or conduit from U L Listed gate operator s see text Ground Legend Red Black White Yellow Green a b J3 Figure 15 Wiring detail a inside the junction b...

Страница 20: ...the motor s direction of rotation replace any test circuits you installed between terminals 11 and 13 between 13 and 21 and between 14 and 15 with the proper reversing and stop devices The instructio...

Страница 21: ...J3 In addition terminal block J3 requires a fail safe connection for the photocells Connect the photocells to terminals 20 and 21 Activating Devices and Radio Receiver The acti vating devices and radi...

Страница 22: ...y when an activating signal is sent for 2 and 1 gate leaves respectively DL3 should be illuminated except when the stop button is pressed DL4 and DL5 should be illuminated except when the reversing de...

Страница 23: ...off EP on on off B on on on C off off on Switch 4 Reversing Device Behavior on Closing Refer to the operating logic tables later in these instructions and to the chart below for how to set DIP switch...

Страница 24: ...unit through the bleed screw holes see Fig ure 18 You need to bleed the hydraulic system before setting the gate up for normal operation To run the gate leaf through an open close cycle make sure the...

Страница 25: ...22 The location of the bleed screws on the drive unit top view WARNING The pressure the gate leaf applies to the obstruction is determined by the bypass valve adjustment It is the installer s respons...

Страница 26: ...the extension collar is affected by the overlap of the extension bar and extension U Attach the 750 extension collar to the bottom of the gate leaf with a 7 16 in 1 1 cm bolt Weld together the extens...

Страница 27: ...use check every 6 mo Check all reversing devices Every six months you should verify that all installed reversing devices work properly The Control Panel The control panel requires no maintenance Trou...

Страница 28: ...a reversing device is triggered If either does not illuminate then one of your reversing devices is preventing the gate from responding to your signal Check your reversing devices If no reversing dev...

Страница 29: ...use negligence or accident or has not been operated in accordance with FAAC International Inc s or FAAC S p A s instructions or has been operated under conditions more severe than or otherwise exceedi...

Отзывы: