PATHWAY HD Code Compliant Modular Access System Installation Manual
Page 62 of 92
5.8.9.
Adjust the top rail standoff to contact the underside of the elbow and use the holes
in the standoff as a template to drill 5/16” or 11/32” holes through the platform
angle posts (FIG. 5.39).
5.8.10.
Attach the top rail standoff to the platform angle posts using 5/16”-18 x 1” button
head socket cap screws, 5/16”-18 nylon insert locknuts, and 5/16” flat washers
oriented as shown (FIG. 5.39).
5.8.11.
Drive a 1/4”-14 x 1-1/2” self-drilling, self-tapping screw up through the underside
of the top rail standoff into the 1-1/2” diameter 90° elbow. Put pressure on the
elbow until the threads engage and pull the components together (FIG. 5.40).
5.8.12.
Tighten all fasteners securely, including all ring joiner set screws and elbow
assembly screws, if not completed previously.
FIG. 5.39
FIG. 5.40
Содержание PATHWAY HD Code Compliant Modular Access System
Страница 13: ...PATHWAY HD Code Compliant Modular Access System Installation Manual Page 13 of 92 FIG 2 5 FIG 2 6...
Страница 25: ...PATHWAY HD Code Compliant Modular Access System Installation Manual Page 25 of 92 FIG 4 2 FIG 4 1...
Страница 91: ......
Страница 92: ...Thank you for choosing EZ ACCESS for your accessibility needs www ezaccess com...