4 Repeat step
through step
on the other side of the chassis.
Figure 6: Flush Mount Power Supply Front Configuration
1 = Ear mount screw removal
4 = Ear mount screw insertion
2 = Rack mount ear pivot screw
5 = Pivot screw retightened
3 = Repositioning of rack mount ear
Mid-Mount Configuration with I/O Ports Facing Front
The mid-mount, I/O ports facing front configuration is depicted in callout 3,
rack mount configuration requires repositioning the rack mount ears on both sides of the device.
To reposition the rack mount ears for this configuration, follow these steps:
1 Unscrew the two rack mount ear screws as shown by callout 1,
2 Reposition the rack mount ear, shown by callout 2, with the middle and power supply side screw
holes.
3 Reinsert the two rack mount ear screws, shown by callout 3.
Installation
S-Series Stand Alone (SSA) Switch Hardware Installation Guide
18