BlackDiamond 8800 Series Switches Hardware Installation Guide
93
Figure 57: Securing the BlackDiamond 8810 Chassis to a Rack
7
Remove the support bracket from the system rack after the chassis is secured. Save the bracket for
future use if you remove the chassis from the rack.
Grounding the BlackDiamond 8800 Series Chassis
Although grounding the BlackDiamond 8800 series chassis is optional, it is recommended. A grounding
point with integrated pem-nuts is provided on the back of the chassis.
You need the following materials to ground the chassis:
●
Two 10-24 screws
●
One copper, standard barrel 2-hole compression grounding lug, type LDC, equivalent to Panduit
part number LCD4-14A-L or Thomas & Betts part number: LCN4-14
●
Appropriate grounding wire for your system, based on the available input current for the power
supply:
■
For AC systems using a 20A breaker per PSU (SSI AC), the chassis ground can be as small as
14 AWG.
■
For DC systems using a 40A breaker per PSU (SSI DC), the chassis ground can be as small as
10 AWG.
EX_172A
Содержание BlackDiamond 8806
Страница 8: ...Contents BlackDiamond 8800 Series Switches Hardware Installation Guide 8...
Страница 11: ...1 About the BlackDiamond 8800 Series Switches...
Страница 12: ......
Страница 63: ...2 Installing BlackDiamond 8800 Series Hardware...
Страница 64: ......
Страница 125: ...3 Installing BlackDiamond Switch Accessories...
Страница 126: ......
Страница 149: ...BlackDiamond 8800 Series Switches Hardware Installation Guide 149 4 BlackDiamond Maintenance Procedures...
Страница 150: ...BlackDiamond 8800 Series Switches Hardware Installation Guide 150...
Страница 158: ...Replacing BlackDiamond 8800 Series Chassis Components BlackDiamond 8800 Series Switches Hardware Installation Guide 158...
Страница 167: ...5 Appendices...
Страница 168: ......
Страница 192: ...Technical Specifications BlackDiamond 8800 Series Switches Hardware Installation Guide 192...
Страница 200: ...Index BlackDiamond 8800 Series Switches Hardware Installation Guide 200...