18
RDT-07-0122
®
NORD
fire
|
FDMQ
www.etsnord.com
5. Statement of installations
5.1 Installation method list
Tab 5.1.1. Installation method list
Fire separating constru.
Wall/Ceiling
Installation
Fire
resist.
Page
Min.thickness
[mm]
Solid wall construction
100
Mortar or gypsum
EIS 120
EIS 90
19
100
Fire protection foam with stucco
plaster
EIS 60
EIS 45
EIS 30
19
100
Battery - mortar or gypsum
EIS 90
20
100
Installation next to wall - mortar or
gypsum and mineral wool
EIS 90
21
100
Stuffing box with fire protection
mastic and cement lime plate
EIS 90
22
100
Weichschott
EIS 90
23
Outside solid wall
construction
100
Mineral wool - mortar or gypsum
EIS 60
24
100
Mineral wool - stuffing box, fire
protection mastic and cement plate EIS 60
25
100
Mineral wool - stuffing box and fire
protection mastic
EIS 90
26
Gypsum wall
construction
100
Mortar or gypsum
EIS 120
EIS 90
27
100
Fire protection foam with stucco
plaster
EIS 60
EIS 45
EIS 30
28
100
Battery - mortar or gypsum
EIS 90
29
100
Installation next to wall - mortar or
gypsum and mineral wool
EIS 90
30
100
Stuffing box with fire protection
mastic and cement lime plate
EIS 90
31
100
Weichschott
EIS 90
32
Outside gypsum wall
construction
100
Mineral wool - mortar or gypsum
EIS 60
33
100
Mineral wool - stuffing box and fire
protection mastic
EIS 60
34
100
Mineral wool, stuffing box, fire
protection mastic and cement lime
plate
EIS 90
35
Solid ceiling
construction
110 - Concrete
125 - Aerated
concrete
Mortar or gypsum
EIS 60
36
Battery - mortar or gypsum
EIS 90
37
Stuffing box with fire protection
mastic and cement lime plate
EIS 90
38
Weichschott
EIS 90
39
Outside solid ceiling
construction
110 - Concrete
125 - Aerated
concrete
Mineral wool - mortar or gypsum
EIS 90
40
Concrete
EIS 90
41