
1/5/2007
EAG Gateway Series Administration Guidelines
MAG-06007 Rev. A
1.
Turn the two thumb screws of the blank face plate covering the slot housing Power Supply
Module counter clock-wise. Store the blank face plate away for later use.
2.
Slide the Power Supply Module along the guide rail into the chassis.
3.
Snap the Power Supply Module on to the backplane in the chassis.
4.
Turn the two thumb screws clock-wise to secure the Main Control Module until they stops.
4.5 Installing EAG onto a Standard Shelf
EAG is designed to fit into a standard 19 inch shelf with standard 1U form factor. Its physical
dimension is 4.4cm high x 43.8cm wide x 42.5cm deep.
Installation procedure is as follows:
1.
Place a EAG into an empty slot on a 19 inch shelf and identify the left and right hand.
2.
Use the screws in the shipping package to secure the EAG onto the shelf, as illustrated in Figure
8.
Figure 8. Installing EAG onto a 19 inch shelf
3.
The shelf and the hands will hold the EAG in place.
Note:
Ensure EAG is horizontal and stable.
Ensure there is ample airflow space around EAG.
Ensure enough space between two EAGs for ventilation when multiple EAGs are installed.
4.6 Installing Cables
4.6.1
Connecting Console Port
There is a Console Port on EAG for local configuration, management and diagnostics. EAG can be
20