
1/5/2007
EAG Gateway Series Administration Guidelines
MAG-06007 Rev. A
4 Installation
4.1 Tools Required for Installation
․
Screw driver
․
Static discharge wrist strip
․
Ethernet and console port cables
․
Power cable
․
Telephone cable
․
Wiring HUB, phone handset, fax or, PBX
․
Terminals (a PC running terminal program can be used)
․
Universal electric meter
4.2 Installing the Main Control Module
All EAG modules are hot-swappable. Installation and maintenance is very easy. Just Please follow the
procedure below:
1.
Turn the two thumb screws of the blank face plate covering the slot housing the Main Control
Module counter clock-wise. Store the blank face plate away for later use.
2.
Slide EAG Main Control Module along the guide rail into the chassis.
3.
Snap the Main Control Module on to the backplane in the chassis.
4.
Turn the two thumb screws clock-wise to secure the Main Control Module until they stops.
4.3 Installing the FXS Interface Module
Please follow the procedure below:
1.
Turn the two thumb screws of the blank face plate covering the slot housing the FXS Interface
Module counter clock-wise. Store the blank face plate away for later use.
2.
Slide the FXS Interface Module along the guide rail into the chassis.
3.
Snap the FXS Interface Module on to the backplane in the chassis.
4.
Turn the two thumb screws clock-wise to secure the FXS Interface Module until they stops.
4.4 Installing the Power Supply Module
Please follow the procedure below to install the Power Supply Module.
19