![Erreka Dolfin DOS424E Скачать руководство пользователя страница 58](http://html1.mh-extra.com/html/erreka/dolfin-dos424e/dolfin-dos424e_installer-manual_2424396058.webp)
Instalacion_153.fm -
5/9/11
INSTALLATION
54
Installation Manual
3
INSTALLING THE OPERATOR
Position the operator
1
Position the operator on the base (1). Do not attach
just yet.
2
Place a pencil (2) in the supports (3) so that it
touches the leaf of the gate.
3
Move the gate from end to end in order for the
pencil to make a mark [M] on it. This mark will be
used to position the guide profile.
4
6
7
5
205 mm
38 mm
1
Gate
2
Belt
3
Pulley
4
Operator
5
Guide profile
6
Base for the operator
7
Electrical cable ducts
The base of the operator must be
suitable for the strain involved.
During the construction of the base, install
ducts for the electrical cables.
Assembly positions and levels
Содержание Dolfin DOS424E
Страница 2: ......
Страница 26: ...Actualizado 23 5 11 MANTENIMIENTO Y DIAGN STICO DE AVER AS 22 Manual de instalaci n...
Страница 48: ...Mis jour 7 9 11 MAINTENANCE ET DIAGNOSTIC DE PANNES 44 Manuel d installation...
Страница 70: ...Updated 5 9 11 MAINTENANCE AND DIAGNOSIS OF FAILURES 66 Installation Manual...
Страница 92: ...Actualizado 7 9 11 MANUTEN O E DIAGN STICO DE AVARIAS 88 Manual de instala o...
Страница 114: ...Erreka B Ibarreta s n 20577 Antzuola Gipuzkoa T 943 786 150 F 943 787 072 info erreka com www erreka com MSM 038 02...