Eridan IP535-07ea-RS Скачать руководство пользователя страница 12

12 

Sealing  of  the  threaded  connection  can  be  carried  out  with  epoxy  compounds  or  similar 

materials with the operating temperature and properties compliant with the operating conditions of 
the call point. 

8.15.

 

In order to connect the call point to the alarm circuit, open the cover (6). 

Connection of the call point when the power supply is on is prohibited. 

8.16.

 

Insert prepared cables into the respective cable glands (ends of outer cable sheath must be 

projecting by minimum 5 mm from the input device inside the call point), tighten the unions of the 
cable glands and fix them with lock nuts. 

8.17.

 

Check the cable clamp in the cable glands for pulling out. 

8.18.

 

The  electric  cables  connected  to  the  call  point  should  be  protected  from  tension  and 

torsion loads. 

8.19.

 

The  call  point  must  be  connected  to  the  alarm  loop  in  accordance  with  the  diagrams 

shown in Annex B observing the legend to the images. 

Power supply and data exchange of the call point are provided via the four-wire communication 

line:  2  wires  -  RS-485  line,  Modbus  RTU  protocol,  2  wires  -  electrical  power  supply.  The  call 
points must be connected to communication line in parallel, with strict observation of polarity. 

When  connecting  the  call  point  to  FACP  via  R1  relay  ‘Activated’  and  R2  relay  ‘Fault’,  an 

additional  R

ADD

  and  terminal  R

TERM

  resistors  are  to  be  selected  in  accordance  with  the  FACP 

documentation. 

8.20.

 

For connecting the wires to the terminals: 

a)

 

remove 6-8 mm of insulation from loose wires of all cables 

b)

 

open the input orifice of the terminal using the supplied WAGO terminal key or an eyeglass 

screwdriver 

c)

 

insert the wire without insulation into the terminal entrance hole and clamp by releasing the 

terminal wrench or the screwdriver 

d)

 

after that, self-disconnecting becomes impossible. 

8.21.

 

Check  the  completed  installation  by  drawing  attention  to  the  correctness  of  the 

connections, the presence of all fastening and locking elements and their correct installation. 

8.22.

 

Close  the  cover  (6)  of  the  call  point,  tighten  it  until  properly  sealed,  use  the  driving 

element (2) to prevent self-unscrewing. The minimum tightening torque of the call point cover must 
be 16 Nm. The correct position of the cover is shown in Figure 1. 

8.23.

 

Install the seal via the holes in the cover (6) and the driving element (2) itself. 

8.24.

 

Each call point must be grounded by means of the external earthing bolt (21) (Figure 1). 

When connecting the earthing, please,  follow the requirements of  the Electrical Installation Code. 
Apply  corresponding  grease  on  the  contact  grounding  clamp  for  protection  against  corrosion  and 
atmospheric agents. 

8.25.

 

When the fire alarm system installation is complete, check functionality of data exchange 

between  the  call  point  and  the  top  level  device  by  reading  the  corresponding  registers  of  the  call 
point status. 

8.26.

 

When the call point (device) is in stand-by mode, the green LED is in flashing mode. For 

activation of the call point, break the seal and pull out the driving element (2) (for the IP535-07ea-
RS-B or UDP IP535-07ea-RS-START, shift the protective element (8) thus breaking the removable 
element  (3)  and  giving  access  to  the  driving  element  (2),  then  pull  out  the  driving  element).  The 
device will receive ‘Activated’ signal from the call point. Upon acknowledgement of the activation 
signal  by  the  panel  (handshake),  the  switch  of  the  call  point  (device)  from  standby  mode  to 
‘Activated’ mode will be indicated by means of the red signal LED on the face surface of the cover. 

Fixation of the driving element of the call point IP535-07ea-RS-A is carried out by means of a 

braided rope (30). 

The  method  of  returning  the  call  point  from  ‘Activated’  mode  back  to  standby  mode  will 

depend on the value of bit 0 ‘Activation registration’ in register 50 (see Annex B). 

Содержание IP535-07ea-RS

Страница 1: ...nel e mail market eridan zao ru http www eridan ru 2 26 30 50 121 Explosion Proof Addressable Manual Fire CALL POINT IP535 07ea RS Modbus RTU protocol Operation Manual 4371 006 43082497 04 04 2021 EXP...

Страница 2: ...degree IP and the operating temperature range of cable glands should correspond to the operating conditions of the call point The call point can be installed in class 1 and 2 indoor explosive areas an...

Страница 3: ...vice UDP 4 X4 designation of the version variant for the IP535 07ea RS call point call point class as per GOST R 53325 2012 A class A one step activation B class B activation by performing several act...

Страница 4: ...l point are provided via the four wire communication line 2 wires RS 485 line Modbus RTU protocol 2 wires electrical power supply The call points must be connected to communication line in parallel wi...

Страница 5: ...r normal climatic conditions withstands a sinusoidal alternating voltage of 0 55 kV 50 Hz during one minute 2 17 Electrical resistance of insulation between the connected output conductors and the cal...

Страница 6: ...otection degree IP and the operating temperature range of cable glands should correspond to the operating conditions of the call point By agreement with the customer call points can be equipped with d...

Страница 7: ...al power supply The call points must be connected to communication line in parallel with strict observation of polarity Connection diagrams of the call point are shown in Annex B In order to configure...

Страница 8: ...s will cause the instrument to receive the Activated signal from the call point device it will display the corresponding message and will send back to the call point an acknowledgement of successful s...

Страница 9: ...explosion protection type explosion proof enclosure and explosion protection level 1 The protection degree IP and the operating temperature range of cable glands should correspond to the operating co...

Страница 10: ...cover and the body 6 12 The call point must be sealed after installation 7 SAFETY PROVISIONS 7 1 Compliance with the safety rules is mandatory for safe operation and use of the call points 7 2 Any wor...

Страница 11: ...n of the call point at the facility must follow the predesigned plan taking into consideration all the requirements hereof 8 5 Prior to installation of the call point at the site remove plugs from the...

Страница 12: ...ible 8 21 Check the completed installation by drawing attention to the correctness of the connections the presence of all fastening and locking elements and their correct installation 8 22 Close the c...

Страница 13: ...r and its address Customs Union conformity mark name or logo of certification authority and number of the certificate of compliance 9 3 The sequence of marking records is determined by the manufacture...

Страница 14: ...1 0 h 10 5 It is strictly prohibited to operate the call point with damaged explosion proof parts and any other defects 10 6 Opening of the call point cover and inspection are only allowed after all...

Страница 15: ...he fire device 11 3 In case of other more complicated failures their elimination can be carried out only at the manufacturer s factory Eridan JSC 11 4 In case of the call point s failure there are no...

Страница 16: ...al rules of cargo transportation 12 3 During transportation the requirements of the manipulation signs on the transportation packages must be strictly complied with During cargo handling and transport...

Страница 17: ...omer 14 CLAIM INFORMATION 14 1 Claims regarding quality of the call point are accepted upon submission of the call point this technical certificate and the report on hidden defects 14 2 The manufactur...

Страница 18: ...ed by the Certification Authority OS POZHTEST of FGBU VNIIPO of Emercom of Russia Certificate of compliance with the Technical Regulations of the Customs Union TR CU 020 2011 EAEU No RU RU 40 00693 20...

Страница 19: ...holes for sealing with the driving element the arrows on the call point nameplate must face vertically down as per the figure 7 lens 15 disk 23 24 washer 21 bolt 27 magnet 28 sealing ring 29 LED 30 b...

Страница 20: ...20 b Appearance of the call point IP535 07ea B...

Страница 21: ...3 removable element 4 body 6 cover the arrows on the device nameplate must face vertically down as per the figure 7 lens 8 protective element 15 disk 23 24 washer 21 bolt 27 magnet 28 sealing ring 29...

Страница 22: ...ble in cable gland KVBU 1 sheath wall maximum diameter for cable entry Dc 12 mm 2 cable insulation 3 sealing ring along the cable wrapping L 20 mm in uncompressed condition 4 washer 5 lock nut 6 union...

Страница 23: ...exceeding 2 5 mm is not allowed 2 insert the wire free from insulation into the inlet of the terminal 3 clamp the wire by releasing the terminal wrench or the screwdriver after that self disconnectin...

Страница 24: ...2 Terminal board of the call point IP535 07ea RS Table 5 The terminals designation for the call point IP535 07ea RS No of socket No of contact Designation of contact Description 1 1 6 Usup Feed throug...

Страница 25: ...of the contacts of the relay R2 Failure Terminal RTERM and additional RADD resistors are selected in accordance with FACP operation manual Install the jumper in terminals 3 7 of socket 2 of the call p...

Страница 26: ...f the call point Figure 5 Diagram of connection of the call point to fire alarm loop activated by closing The off position of the relay R1 Activated is configured as normally closed NC The call point...

Страница 27: ...ask and OR mask 0 17 reading and recording of various storage registers 0 2B 0 0E reading of device identifier processing of broadcast packets with a slave device address equal to 0 There is no respon...

Страница 28: ...ersion 0 65535 3 0x0008 8 0 03 UINT Serial number Lo 0 65535 0x0009 9 0 03 UINT Serial number Hi 0 65535 0x000A 10 0 03 UINT Device general status 1 6 1 booting 2 test 3 normal 4 acknowledgement reque...

Страница 29: ...t is activated 0 Installed 9 15 Reserve 14 Table 8 Configuration register register 50 0 0032 Bit No Designation Note 0 1 Activated signal is registered before reveiving a reset command status registra...

Отзывы: