Wait for one second. The call point must be in standby mode. The LED indicator (29) of the 

call point must be flashing green. 

d)

 

Set  the  configuration  settings  of  the  device  (register  50)  necessary  for  call  point’s 

functionality check.  

The call point can be configured using applications mentioned in clause 8.3(a) as well as via a 

specialized application ‘Configuration tool for IP535-07ea-RS’ (www.eridan.ru). 

e)

 

In order to check functionality of exchange between the call point and the PC, see registers 

with addresses 10 (general device status), 11 (diagnostics register) (see Annex B) on the PC screen. 

f)

 

Pull out the driving element (for the IP535-07ea-RS-B or IP535-07ea-RS-START, shift the 

protective  element  (8)  thus  breaking  the  removable  element  (3)  and  giving  access  to  the  driving 
element (2), then pull out the driving element). 

g)

 

The call point (device) switch from standby mode to ‘Activated’ mode will be indicated by 

the red signal LED of the call point (device); the actuating relay R1 will change its status. 

h)

 

Return  the  driving  element  (2)  to  the  initial  position  (for  the  IP535-07ea-RS-B  or  IP535-

07ea-RS-START, return the driving element (2) to the initial position; install the protective element 
(8) fixing it with the removable element (3) from the scope of supply). 

i)

 

The method of returning the call point from ‘Activated’ mode back to standby mode will 

depend on the value of bit 0 ‘Activation registration’ in register 50 (see Annex B). 

j)

 

After performing the functional check, set the configuration settings of the device with the 

values that the call point will use for operation in the system (device address, communication and 
operation parameters, etc.). 

k)

 

Turn  off  the  power  supply  and  unplug  the  call  point,  disconnect  RS-485  communication 

line wires. The check is complete. 

8.4.

 

Installation  of  the  call  point  at  the  facility  must  follow  the  predesigned  plan  taking  into 

consideration all the requirements hereof. 

8.5.

 

Prior to installation of the call point at the site, remove plugs from the seals. 

8.6.

 

The body (4) of the call point (Figure 1, Annex A) is fixed to a vertical surface via 2 

mm holes. 

In case the fasteners from the supplied package do not correspond to the surface type, on which 

the call point is to be installed, the customer shall purchase additional fasteners. 

8.7.

 

Recommended position of the call point: with the input devices facing down (see figure 1, 

Annex A). 

8.8.

 

When  connecting  the  call  point,  cable  sealing  must  be  carried  out  along  the  casing 

(wrapping) using sealing rings of the correspondent diameter from the supply package. 

8.9.

 

In  case  of  installation  in  the  pipe,  the  pipe  coupling  is  screwed  directly  onto  the  union 

with outer thread (Figure 2b, Annex A).   

8.10.

 

In case armored cable and cable bland KVB12 are used, armor diameter must not exceed 

12 mm (Figure 2a, Annex A). Cable is inserted into the call point through the hole in the union (6), 
and then the nut (7) is screwed onto the union to secure the cable and ground the armor. 

8.11.

 

In  case  cable  gland  КVB17  is  used,  cable  armor  diameter  must  not  exceed  17  mm, 

earthing of the armor is carried out by means of a tap (12) (Figure 2c, Annex A). 

8.12.

 

Protection of the cable in explosive areas by means of metal hose is possible (pursuant to 

the  requirements  of  GOST  IEC  60079-14-2013).  Cable  gland  КVМ15  (KVM20)  is  designed  for 
installation of the cable in metal hose with nominal diameter D=15 mm (20 mm). An example of 
installation of the metal hose in cable gland is shown in figure 2d, Annex A. 

8.13.

 

Any vacant input device must be securely sealed with the plug. Plug installation is shown 

in Figure 2e. 

8.14.

 

When using cable glands of other manufacturers, it is necessary to provide airtightness of 

all  connections  using  any  available  means  permitted  for  application  in  this  area  pursuant  to  its 
hazard class. 

Содержание IP535-07ea-RS

Страница 1: ...nel e mail market eridan zao ru http www eridan ru 2 26 30 50 121 Explosion Proof Addressable Manual Fire CALL POINT IP535 07ea RS Modbus RTU protocol Operation Manual 4371 006 43082497 04 04 2021 EXP...

Страница 2: ...degree IP and the operating temperature range of cable glands should correspond to the operating conditions of the call point The call point can be installed in class 1 and 2 indoor explosive areas an...

Страница 3: ...vice UDP 4 X4 designation of the version variant for the IP535 07ea RS call point call point class as per GOST R 53325 2012 A class A one step activation B class B activation by performing several act...

Страница 4: ...l point are provided via the four wire communication line 2 wires RS 485 line Modbus RTU protocol 2 wires electrical power supply The call points must be connected to communication line in parallel wi...

Страница 5: ...r normal climatic conditions withstands a sinusoidal alternating voltage of 0 55 kV 50 Hz during one minute 2 17 Electrical resistance of insulation between the connected output conductors and the cal...

Страница 6: ...otection degree IP and the operating temperature range of cable glands should correspond to the operating conditions of the call point By agreement with the customer call points can be equipped with d...

Страница 7: ...al power supply The call points must be connected to communication line in parallel with strict observation of polarity Connection diagrams of the call point are shown in Annex B In order to configure...

Страница 8: ...s will cause the instrument to receive the Activated signal from the call point device it will display the corresponding message and will send back to the call point an acknowledgement of successful s...

Страница 9: ...explosion protection type explosion proof enclosure and explosion protection level 1 The protection degree IP and the operating temperature range of cable glands should correspond to the operating co...

Страница 10: ...cover and the body 6 12 The call point must be sealed after installation 7 SAFETY PROVISIONS 7 1 Compliance with the safety rules is mandatory for safe operation and use of the call points 7 2 Any wor...

Страница 11: ...n of the call point at the facility must follow the predesigned plan taking into consideration all the requirements hereof 8 5 Prior to installation of the call point at the site remove plugs from the...

Страница 12: ...ible 8 21 Check the completed installation by drawing attention to the correctness of the connections the presence of all fastening and locking elements and their correct installation 8 22 Close the c...

Страница 13: ...r and its address Customs Union conformity mark name or logo of certification authority and number of the certificate of compliance 9 3 The sequence of marking records is determined by the manufacture...

Страница 14: ...1 0 h 10 5 It is strictly prohibited to operate the call point with damaged explosion proof parts and any other defects 10 6 Opening of the call point cover and inspection are only allowed after all...

Страница 15: ...he fire device 11 3 In case of other more complicated failures their elimination can be carried out only at the manufacturer s factory Eridan JSC 11 4 In case of the call point s failure there are no...

Страница 16: ...al rules of cargo transportation 12 3 During transportation the requirements of the manipulation signs on the transportation packages must be strictly complied with During cargo handling and transport...

Страница 17: ...omer 14 CLAIM INFORMATION 14 1 Claims regarding quality of the call point are accepted upon submission of the call point this technical certificate and the report on hidden defects 14 2 The manufactur...

Страница 18: ...ed by the Certification Authority OS POZHTEST of FGBU VNIIPO of Emercom of Russia Certificate of compliance with the Technical Regulations of the Customs Union TR CU 020 2011 EAEU No RU RU 40 00693 20...

Страница 19: ...holes for sealing with the driving element the arrows on the call point nameplate must face vertically down as per the figure 7 lens 15 disk 23 24 washer 21 bolt 27 magnet 28 sealing ring 29 LED 30 b...

Страница 20: ...20 b Appearance of the call point IP535 07ea B...

Страница 21: ...3 removable element 4 body 6 cover the arrows on the device nameplate must face vertically down as per the figure 7 lens 8 protective element 15 disk 23 24 washer 21 bolt 27 magnet 28 sealing ring 29...

Страница 22: ...ble in cable gland KVBU 1 sheath wall maximum diameter for cable entry Dc 12 mm 2 cable insulation 3 sealing ring along the cable wrapping L 20 mm in uncompressed condition 4 washer 5 lock nut 6 union...

Страница 23: ...exceeding 2 5 mm is not allowed 2 insert the wire free from insulation into the inlet of the terminal 3 clamp the wire by releasing the terminal wrench or the screwdriver after that self disconnectin...

Страница 24: ...2 Terminal board of the call point IP535 07ea RS Table 5 The terminals designation for the call point IP535 07ea RS No of socket No of contact Designation of contact Description 1 1 6 Usup Feed throug...

Страница 25: ...of the contacts of the relay R2 Failure Terminal RTERM and additional RADD resistors are selected in accordance with FACP operation manual Install the jumper in terminals 3 7 of socket 2 of the call p...

Страница 26: ...f the call point Figure 5 Diagram of connection of the call point to fire alarm loop activated by closing The off position of the relay R1 Activated is configured as normally closed NC The call point...

Страница 27: ...ask and OR mask 0 17 reading and recording of various storage registers 0 2B 0 0E reading of device identifier processing of broadcast packets with a slave device address equal to 0 There is no respon...

Страница 28: ...ersion 0 65535 3 0x0008 8 0 03 UINT Serial number Lo 0 65535 0x0009 9 0 03 UINT Serial number Hi 0 65535 0x000A 10 0 03 UINT Device general status 1 6 1 booting 2 test 3 normal 4 acknowledgement reque...

Страница 29: ...t is activated 0 Installed 9 15 Reserve 14 Table 8 Configuration register register 50 0 0032 Bit No Designation Note 0 1 Activated signal is registered before reveiving a reset command status registra...

Отзывы: