![Eridan IP535-07ea-RS Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/eridan/ip535-07ea-rs/ip535-07ea-rs_operation-manual_2423668011.webp)
11
c)
Wait for one second. The call point must be in standby mode. The LED indicator (29) of the
call point must be flashing green.
d)
Set the configuration settings of the device (register 50) necessary for call point’s
functionality check.
The call point can be configured using applications mentioned in clause 8.3(a) as well as via a
specialized application ‘Configuration tool for IP535-07ea-RS’ (www.eridan.ru).
e)
In order to check functionality of exchange between the call point and the PC, see registers
with addresses 10 (general device status), 11 (diagnostics register) (see Annex B) on the PC screen.
f)
Pull out the driving element (for the IP535-07ea-RS-B or IP535-07ea-RS-START, shift the
protective element (8) thus breaking the removable element (3) and giving access to the driving
element (2), then pull out the driving element).
g)
The call point (device) switch from standby mode to ‘Activated’ mode will be indicated by
the red signal LED of the call point (device); the actuating relay R1 will change its status.
h)
Return the driving element (2) to the initial position (for the IP535-07ea-RS-B or IP535-
07ea-RS-START, return the driving element (2) to the initial position; install the protective element
(8) fixing it with the removable element (3) from the scope of supply).
i)
The method of returning the call point from ‘Activated’ mode back to standby mode will
depend on the value of bit 0 ‘Activation registration’ in register 50 (see Annex B).
j)
After performing the functional check, set the configuration settings of the device with the
values that the call point will use for operation in the system (device address, communication and
operation parameters, etc.).
k)
Turn off the power supply and unplug the call point, disconnect RS-485 communication
line wires. The check is complete.
8.4.
Installation of the call point at the facility must follow the predesigned plan taking into
consideration all the requirements hereof.
8.5.
Prior to installation of the call point at the site, remove plugs from the seals.
8.6.
The body (4) of the call point (Figure 1, Annex A) is fixed to a vertical surface via 2
9
mm holes.
In case the fasteners from the supplied package do not correspond to the surface type, on which
the call point is to be installed, the customer shall purchase additional fasteners.
8.7.
Recommended position of the call point: with the input devices facing down (see figure 1,
Annex A).
8.8.
When connecting the call point, cable sealing must be carried out along the casing
(wrapping) using sealing rings of the correspondent diameter from the supply package.
8.9.
In case of installation in the pipe, the pipe coupling is screwed directly onto the union
with outer thread (Figure 2b, Annex A).
8.10.
In case armored cable and cable bland KVB12 are used, armor diameter must not exceed
12 mm (Figure 2a, Annex A). Cable is inserted into the call point through the hole in the union (6),
and then the nut (7) is screwed onto the union to secure the cable and ground the armor.
8.11.
In case cable gland КVB17 is used, cable armor diameter must not exceed 17 mm,
earthing of the armor is carried out by means of a tap (12) (Figure 2c, Annex A).
8.12.
Protection of the cable in explosive areas by means of metal hose is possible (pursuant to
the requirements of GOST IEC 60079-14-2013). Cable gland КVМ15 (KVM20) is designed for
installation of the cable in metal hose with nominal diameter D=15 mm (20 mm). An example of
installation of the metal hose in cable gland is shown in figure 2d, Annex A.
8.13.
Any vacant input device must be securely sealed with the plug. Plug installation is shown
in Figure 2e.
8.14.
When using cable glands of other manufacturers, it is necessary to provide airtightness of
all connections using any available means permitted for application in this area pursuant to its
hazard class.
Содержание IP535-07ea-RS
Страница 20: ...20 b Appearance of the call point IP535 07ea B...