![Ericsson Base Station F800 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/ericsson/base-station-f800/base-station-f800_field-service-manual_2422934027.webp)
INSTALLATION
6 (6)
Uppgjord (även faktaansvarig om annan) -
Prepared (also subject responsible if other)
Nr -
No.
KL/ECS/S/LT Magnus Lindahl
ECS/S/LT-96:5036
Dokansv/Godk -
Doc respons/Approved
Kontr -
Checked
Datum -
Date
Rev
File
KI/ECS/S/LTC
1996-06-04 A
Error! Unknown switch argument.
INSTALLATION DOCUMENTATION
On completion of installation, the technician should prepare installation
documentation which should include specific instructions and documents to facilitate
servicing of the installation. The installation documentation should be available at the
installation site and at the local workshop.
The installation documentation may include, for example:
How access is obtained to the site (keys, etc.)
General information on the power supply (location of fuses and switches)
Information on control and maintenance of the air-conditioning equipment, if
provided, etc.
Further, copies of the forms in chapter 5, Commissioning, must be filled in and
included with the documentation.