Erato Pony PS9 Скачать руководство пользователя страница 48

Page. 

48/55 

The connecting pipe of 
the 

presostad 

is 

defective,  removed  or 
clogged 

Check  the  connecting  pipe  of 
the  presostad  for  connectivity 
and possibility.  

Defective 

control 

board 

Change the control board 

Blocked smoke tract 

Clean  and  check  the  chimney 
and  the  smoke  tract  for  any 
untied spots. 

Defective 

safety 

thermostat 

Check  it  for  functionality  / 
change it if necessary  

The probe of the safety 
thermostat 

is 

incorrectly mounted 

Mount  the  probe  of  the 
thermostat 

according 

the 

requirements  

Defective 

control 

module 

Change the control module 

The  safety  thermostat 
is not receive electrical 
supply 

Check  the  condition  of  the 
cable  connecting  the  safety 
thermostat 

to 

the 

control 

module,  check  the  electric 
connections 

3.

 

  The 

safety 

thermostat 

is 

activated 

The  convection  fan  is 
not working 

Check  the  condition  of  the 
convection  fan  /  if  necessary 
replace it  

Blocked smoke tract 

Clean  and  check  the  chimney 
and  the  smoke  tract  for  any 
untied spots. 

Defective 

control 

module 

Change the control module 

The  sensor  measuring 
the  temperature  of  the 
smoke  gases  does  not 
work 

Change 

the 

sensor 

for 

temperature of the smoke gases 

The  sensor  measuring 
the  temperature  of  the 
smoke  gases  in  not 
connected correctly 

Check  the  mounting  of  the 
sensor  for  temperature  of  the 
smoke gases 

4.

 

  The  sensor  for 

surrounding 

air 

temperature  does 
not 

work 

correctly  or  The 
sensor  for  flue 
gases 
temperature  does 
not 

work 

correctly 

Incorrect 

control 

settings  influenced  by 
the  measurements  of 
the mentioned sensors 

Check the parameters and setup 
the  defaults      –  It  is  done  by 
service personnel 
 

Содержание Pony PS9

Страница 1: ...USER MANUAL of hot air automated pellet stove ERATO Pony PS9 http www erato bg...

Страница 2: ...WITH THE BOILER MOUNTING CONNECTING ETC IN CASE THAT REQUIREMENTS DEPICTED IN THIS MANUAL ARE NOT SATISFIED FAILURES OF THE UNIT COULD BE EXPECTED OR EVEN FATAL CONSEQUENCES FOR WHICH ERATO COMPANY D...

Страница 3: ...e 29 5 2 4 Turning on the appliance 29 5 2 5 Set up of the stoves parameters 30 5 2 6 Set up of the stove according to the thermal power needed 34 5 2 8 Nominal operation mode of the stove 35 5 3 Adju...

Страница 4: ...Page 4 55 6 Electrical scheme of the apliance 51 QUALITY CERTIFICATE 52 WARRANTY CONDITIONS 53 WARRANTY SERVICE PROCEDURES LIST 54 Declaration of Conformity 55...

Страница 5: ...ly cable PC AC 220V 1 ct Users guide for ERATO Pony PS9 1 ct The unit could utilize following types of fuel Wood pellets having diameter 6 mm categorized in the range of A AB B according to the method...

Страница 6: ...ergy price is competitive to the conventional energy sources The stove is automatic and the thermal comfort achieved is close to that originating from exploitation of fully automatic heaters for examp...

Страница 7: ...tion range kW 3 5 9 Utilized solid fuel Wood pellets diameter d 6mm Utilized pellets complying ERATO classification methodology A AB B Wood pellets fuel consumption rate at nominal thermal capacity kg...

Страница 8: ...re in the heated space C 14 Draught Pa 4 10 Fresh air channel mm 35 Connections Flue gases duct mm 80 Electrical supply 50Hz 230V Electrical power VA 100 350 at ignition process IP20 Table 2 2 Dimensi...

Страница 9: ...uel properties wood pellets Pellet s category Ad DU A 6 0 d A 0 97 DU AB 6 0 d A 0 97 DU B 0 1 6 0 d A 0 97 DU BC 0 1 6 0 d A 0 97 DU C 0 2 0 1 d A 0 97 DU CD 0 2 0 1 d A 0 97 DU D 0 3 0 2 d A 0 97 DU...

Страница 10: ...ENplus A1 ENplus A2 Diameter mm 6 1 6 1 Length mm 3 15 L 40 1 3 15 L 40 1 Bulk density kg m 600 600 Low calorific value MJ kg 16 5 16 5 Moisture content 10 10 Dust 13 1 3 Mechanical durability 97 5 4...

Страница 11: ...eat radiation to the surrounding objects Stainless steel burner mounted in the combustion chamber of the heat exchanger Ash container positioned in the lower part of the combustion chamber below the b...

Страница 12: ...or set up of the control unit And to monitor the work parameters and massages The heat exchanger fuel hopper and other modules of the stove are covered with decorative covers painted in different colo...

Страница 13: ...n dimensions of hot air stove ERATO Pony PS9 are given in figure 3 2 3 3 and 3 4 Figure 3 2 Front and back view of hot air stove ERATO Pony PS9 Figure 3 3 Top and left hand side view of hot air stove...

Страница 14: ...ription of the main modules elements of hot air stove ERATO Pony PS9 Fuel hopper Fuel auger Interface panel of the control module of the stove Fuel auger motor Pipe for fresh air Hot air fan Stainless...

Страница 15: ...g of the stove be careful not to damage the side covers of the stove or the stove itself After unpacking take out of the burning chamber all the accessories if there are any Also take out all elements...

Страница 16: ...t 1meter from the zone of intensive heat radiation In cases that such objects are near to the stove you need to protect them with a lair of fire prove insulating material If the floor is made of flamm...

Страница 17: ...required an unburying stand o Minimal distance of 600mm above of the unit and any ceiling wall should be provided in order to guarantee easy access to the fuel s hopper as well as enough room for cle...

Страница 18: ...to cause skin burns in contact The zones with high surface temperatures are shown in the figure below Figure 4 1 Outer view of hot air stove ERATO Pony PS9 with marked hot zones which must be taken i...

Страница 19: ...using an existing chimney it needs to be thoroughly checked for functionality and safe work because some untied places can cause flue gases to escape to living area and to harm the health of the inha...

Страница 20: ...rence from the straight shape o When building the chimney you need to make it easy for disassembly for cleaning and you need to install condense tubs o The exit section of the chimney must be realized...

Страница 21: ...requirements for placing the chimney according to the characteristics of the building Connecting the pipe fir fresh air for burning in the stove with diameter d 35mm The pipe is not directly connected...

Страница 22: ...stove It is prohibited the premises from which is supplied the fresh air for burning to be used as living areas It is prohibited the premises from which is supplied the fresh air for burning to be us...

Страница 23: ...distance between the boiler and the fuel container to be at least 1500mm It is recommended to store the fuel in room next to that where the stove is installed At the installation procedure of the unit...

Страница 24: ...rained personal regularly The end user should not perform any interventions repairs etc of the unit In case that warning and failures arise check the failures table applied at the end of this manual a...

Страница 25: ...Interface board for control and monitoring of hot air pellet stove ERATO Pony PS9 Button 4 On Off Button 5 and 6 Heating power Clock Air temperature in the room Indications of the work regime of the...

Страница 26: ...Elements of the interface board and their function Button 1 and 2 Temperature set up in the heated room Button 3 Menu It chooses the desired parameter of the menu Button 4 Turns On Off the stove hold...

Страница 27: ...of the buttons of the remote control is similar to the function of the same buttons of the interface board 5 2 2 Description of the function of the buttons of the interface panel In Table 5 2 Is desc...

Страница 28: ...et up of the value and Entering the next level in the menu Work Pushed for 2 sec turns On Off the stove Blocking Unblocks the stove and switches it of 4 Start Stop Menu Programming Goes back to the le...

Страница 29: ...e requirements For instance bad quality pellets can damage the fuel feeding mechanism The unit is connected to the main power supply with the provided connection cable the coupling is connected to the...

Страница 30: ...ove is recommended to ventilate the premises because is possible to accrue unpleasant smell of burning paint ATTENTION During work the door of the stove needs to be completely closed otherwise escape...

Страница 31: ...The weekly program is made by 4 independent programs in which on off are set individually The weekly program can be enabled or disabled In case that is disabled the hronostad ignores the set times in...

Страница 32: ...shown the tree like structure of the menu of the control module of the stove Level 1 Level 2 Level 3 Explanation 01 Day Day of the week 02 Hour Hour 03 Minuets Minute 04 Day Day of the month 05 Month...

Страница 33: ...aturday Program 3 ON OFF 28 Sunday Program 3 ON OFF 29 START Program 4 Hour 30 STOP Program 4 Hour 31 Monday Program 4 ON OFF 32 Tuesday Program 4 ON OFF 33 Wednesday Program 4 ON OFF 34 Thursday Prog...

Страница 34: ...90 o Calculating the heat power of the stove 02 9 0005833 0 17200 90 0 m H P kW when MJ kg are used Or when kWh kg are used 02 9 1 2 77 4 90 0 m H P kW o By analogy you can determent the heat power o...

Страница 35: ...ignited and the room is heated we can assume that the stove works in nominal regime and we can perform the so called HOT TESTS EXPLANATION In nominal regime the stove periodically cleans the ash rema...

Страница 36: ...f the fuel s volatile gases released by the combustion process Note If the flame is dark in color due to lack of oxygen that means that the burner needs cleaning due to lack of oxygen 5 3 Adjustment o...

Страница 37: ...es which will lead to a decrease of the lifetime of the boiler s main modules heat exchanger as well as the burner It is obligatory to perform service procedures and preventive observations of the uni...

Страница 38: ...A sample for cleaning of hot air pellet stove ERATO Pony PS9 After the cleaning is done connect the stove back to the power grid The recommended periods for cleaning are shown in the next table Cleani...

Страница 39: ...tove Get in contact with the service personnel in order to perform a seasonal maintenance and preparation for the next heating season The cleaning of the ahs protects from The maintenance gives a poss...

Страница 40: ...The cleaning of the glass is done when the stove is cooled to room temperature with a proper glass cleaning agents During maintenance be careful not to damage any gaskets If needed a gasket needs to b...

Страница 41: ...cy stop of the stove During exploitation of the stove is possible to accrue situations when the stove goes in regime of failure Some of these conditions are detected from the control and automatically...

Страница 42: ...e unit in different modes and heat capacities according to the local heat consumption Fuel hopper charging the fuel is poured out in the hopper of the boiler and the hopper s cap should be closed in o...

Страница 43: ...ed fuel material smoldering in the ash tray Electrical shock risks at indirect contact The stove is connected to the power circuit and its operating modules are separated in specialized electric contr...

Страница 44: ...t from the control or the hronostad 4 Hard ignition of the pellets Low quality pellets Change the pellets Most likely the humidity is higher than recommended 5 Overheating of the stove Lack of heat lo...

Страница 45: ...ired 10 Appearance of smoke in the heated room after a period of exploitation Clogged and or dirty chimney smoke tract Clean the chimney Check the presostad for functionality it is done by service spe...

Страница 46: ...termine the reason of the alarm To check or replace the heating element it is done by service specialist 4 ALARM NO FIRE Turning OFF during a work faze The alarm appears when the stove is in working f...

Страница 47: ...hange the supply cable Burned fuse Check the condition of the fuses If a fuse is burned determine and fix the reason Defective control module Change the control module 1 The control board and or the i...

Страница 48: ...dule check the electric connections 3 The safety thermostat is activated The convection fan is not working Check the condition of the convection fan if necessary replace it Blocked smoke tract Clean a...

Страница 49: ...f the surrounding air does not work correctly The temperature of the smoke gases is lower that the set one for switching to nominal regime Restart the stove make a second attempt for ignition and if s...

Страница 50: ...der to VALIDATE the WARRANY FORM of the unit 5 13 Actions after the unit is not in exploitation anymore After the lifetime period of the unit has been completed then it should be treated properly in o...

Страница 51: ...hown electrical scheme of hot air pellet stove ERATO Pony PS9 Figure 6 1 Electrical scheme of hot air pellet stove ERATO Pony PS9 Engine convector Smoke fan Engine screw Heating element Thermostat flu...

Страница 52: ...e working with pellets ERATO Pony PS9 For which the current DECLARATION states is in compliance and conformity of all requirements of the standards and normative documents According to BDS EN 14785 20...

Отзывы: