
Maintenance 11. Replacing the Signal Relay Board
180
E2C Rev.6
11.2.2 SM, CM Type Manipulators
Removal
(1) Disconnect all the connectors and tubes from the base connector box (outside).
(2) Remove the base connector box.
For details on the removal method, refer to
Maintenance: 3.4 Base Connector Box
.
(3) Disconnect the connectors (X10, X20, X30, X40, X50, and X4) from the signal relay
board.
To do so, open up the top and bottom clips of the connectors.
Connect motors and the signal relay board with a new cable unit within 2 hours after the
connectors are removed. When motors and the signal relay board are connected with a
new cable unit after 2 hours have passed, the position data in motors will be lost and the
calibration will be required again.
(4) Remove the signal relay board from the
base connector box.
The signal relay board is secured from the
outside of the base connector box.
4-M3
×
6
Signal relay
board
Base connector box
)
NOTE
Содержание E2C Series
Страница 1: ...SCARA ROBOT E2C series MANIPULATOR MANUAL Rev 6 EM069R1409F ...
Страница 2: ...MANIPULATOR MANUAL E2C series Rev 6 ...
Страница 8: ...vi E2C Rev 6 ...
Страница 14: ......
Страница 81: ...Maintenance This volume contains maintenance procedures with safety precautions for E2C series Manipulators ...
Страница 82: ......
Страница 92: ...Maintenance 2 General Maintenance 80 E2C Rev 6 ...
Страница 118: ...Maintenance 4 Replacing the Cable Unit 106 E2C Rev 6 ...
Страница 194: ...Maintenance 11 Replacing the Signal Relay Board 182 E2C Rev 6 ...