Epson Artisan 700/Epson Stylus Photo PX700W/TX700W
Revision C
DISASSEMBLY/ASSEMBLY
Disassembly Procedures
152
Confidential
4.2.4.15 CR Motor
Parts/Components need to be removed in advance:
Main Frame
Removal procedure
1.
Loosen the CR Timing Belt, and detach the CR Timing Belt from the Pinion
Gear of the CR Motor. (See
4.2.4.16 Carriage Unit Step2
-
Step4 (p155)
.)
2.
Remove the securing ring that secures the Spur Gear A, and remove the Spur
Gears (A, B) and Combination Gear (x1).
Figure 4-124. Removing the CR Motor (1)
Align the positioning holes (x2) of the Holder with the dowels
(x2) of the Main Frame. (See
Fig. 4-120
.)
Insert the Compression Spring to the dowel of the Tensioner
and attach it to the protrusion of the Tension Holder
reinforcing plate. (See
Fig. 4-119
.)
A D J U S T M E N T
R E Q U I R E D
After removing/replacing the PF Motor, make the specified
adjustments. (See
Chapter 5 "ADJUSTMENT"
.)
After replacing the PF Motor, be sure to perform the required
lubrication. (See
Chapter 6 "MAINTENANCE"
.)
C H E C K
P O I N T
The Main Frame becomes unstable once it is removed from the
Base Frame. Be careful not to deform the frame during
performing the following procedures.
Refer to
4.2.4.11 Main Frame (p144)
for the Parts/Components
need to be removed before removing the Main Frame.
Spur Gear B
Combination Gear
Spur Gear A
Securing ring
Содержание Artisan 700 Series
Страница 7: ...Confidential C H A P T E R 1 PRODUCTDESCRIPTION ...
Страница 42: ...Confidential C H A P T E R 2 OPERATINGPRINCIPLES ...
Страница 48: ...Confidential C H A P T E R 3 TROUBLESHOOTING ...
Страница 189: ...Confidential C H A P T E R 5 ADJUSTMENT ...
Страница 225: ...Confidential C H A P T E R 6 MAINTENANCE ...