To make connections to the battery (see Figure 32 for all items):
1. Make all connections to the inverter, main disconnect, and external overcurrent protection (if present).
2. Using a 13 mm socket, attach the negative conductor to the negative bus bar
H
with a ring lug.
3. Using a 13 mm socket, attach the positive conductor to the positive bus bar
I
with a ring lug.
4. Insert the bare ground conductor into one of the open box terminals
J
. Tighten with a flat screwdriver.
5. Tighten all conductors according to Table 3.
Table 3
Battery Torque Values
Cable In-lb Nm
Positive (
I
)
65 to 75
7.3 to 8.5
Negative (
H
)
65 to 75
7.3 to 8.5
Ground (
J
)
35 4.0
6. The BMS port is located at
K
. Insert the CANBUS (RJ45) cable for BMS communications.
Figure 32 Battery Wiring and BMS Cable
Wiring is complete.
See the
Mojave ESS Planning Guide
for information on connecting the battery to the inverter.
10
NOTE
: It is required to make one, and only one, mechanical bond between the negative and ground conductors.
This bonding is generally done in the Mojave inverter. A conductor is provided with the inverter for that purpose.
If the bond must be made in the battery instead, connect a wire between points
H
and
J
.
H
I