Operation
NOTES:
The charger cannot exceed the
Import limit (W)
setting, even if
Charge from grid limit
is set higher than
Import limit (W)
.
The inverter gives priority to any loads. The inverter cannot restrict the amount of
power sent to the loads.
If the combination of loads and charging exceeds
Import limit (W)
, the inverter will
reduce the charge rate to avoid overloading the source. .
If the loads
equal
Import limit (W)
, the charge rate will be reduced to zero.
If the loads
exceed
Import limit (W)
, see below.
The
Charge from grid limit (W)
setting does not restrict charging performed while AC
coupling. See page 35.
Demand Mitigation (Peak Reduction)
If the loads exceed
Import limit (W)
, the inverter will support the loads by adding battery power to
the power used from the grid.
This function will discharge the batteries at a current level controlled by the BMS. The level may
vary with operating conditions such as temperature and the present state of the battery. This
operation continues until reaching lower target setting of
Minimum SoC
.