120430
8
All brands and logos are registered trademarks of their respective owners
POWER MANAGEMENT SYSTEM - LAN
2.2. Indicators
Main rocker switch
Z (Figure 1 above) is illuminated - the
PMS-LAN is connected to the power supply and active.
Power indicator
(Figure 1 above) is illuminated. The non-
manageable sockets (marked with the sign
) are
switched on.
The indicator
Socket 1 (2,3,4)
(Figure 1 above) is lit. The
particular socket is switched on.
The indicator
Schedule/LAN activity
(Figure 2 above) blinks
green
– there is some LAN activity taking place.
The indicator
Schedule/LAN activity
(Figure 2 above) blinks
red as the reset procedure is being executed.
The indicator
Schedule/LAN activity
(Figure 2 above) stays
red if an active hardware schedule for any socket exists.