Proline t-mass T 150
Installation
Hauser
15
NOTE!
Mounting for the first time: Tighten thread adapter nut of the coupling
hand tight.
3. Observe the maximum socket height D.
NOTE!
The pipe wall thickness (B) and socket height (D) may not exceed the
permitted height.
B + D may not be greater than 102 mm (4.02 in).
4. If a mounting boss is used, pay attention to mounting boss height C.
NOTE!
The pipe wall thickness (B) and mounting boss height (C) may not exceed
the permitted height.
B + C may not be greater than 53 mm (2.09 in).
Determining the insertion depth before mounting for the first time
‣
For all nominal diameters: 8 + B + D -1
Controlling the insertion depth after mounting
‣
For all nominal diameters: 8 + B + D
Hygienic version
Order code for
"Insertion Length"
, option LH
"Hygienic version"
Factory length
Order code for
"Insertion Tube Material; Sensor"
, option BB
"Stainless steel, factory length,
0.8μm, mechanically polished"
and option BC
"Stainless steel, factory length, 0.4μm,
mechanically polished"
NOTICE
Certain dimensions are required to comply with the factory length.
‣
Pay attention to information in the dimension drawings.