Proline t-mass B 150
Commissioning
Hauser
33
1
2
3
5
4
6
7
A0017373
å
2
Options for remote operation via HART protocol
1
Control system (e.g. PLC)
2
Field Communicator 475
3
Computer with operating tool (e.g. FieldCare, AMS Device Manager, SIMATIC PDM)
4
Commubox FXA195 (USB)
5
Field Xpert SFX100
6
VIATOR Bluetooth modem with connecting cable
7
Transmitter
9
Commissioning
9.1
Function check
Before commissioning the device, make sure that the post-installation and post-connection
checks have been performed.
• Post-mounting check checklist (
®
ä
18)
• Post-connection check checklist (
®
ä
23)
9.2
Switching on the measuring device
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup display to the
measured value display.
If nothing appears on the local display or a diagnostic message is displayed, refer to the
device's operating instructions which can be found on the CD-ROM supplied with the
device.
Содержание Proline t-mass B 150
Страница 39: ......
Страница 40: ...KA01104D 06 EN 01 12 71165082...