Proline Prowirl R 200
Installation
Hauser
19
Q
1
2
3
A0019209
4
Layout for delta heat measurement of saturated steam and water
1
Prowirl
2
Temperature sensor
3
Heat exchanger
Q
Heat flow
Protective cover
Maintain the following minimum head clearance: 222 mm (8.74 in)
6.2
Mounting the measuring device
6.2.1
Required tools
For transmitter
• For turning the transmitter housing: Open-ended wrench8 mm
• For opening the securing clamps: Allen key3 mm
For sensor
For flanges and other process connections: Corresponding mounting tools
6.2.2
Preparing the measuring device
1. Remove all remaining transport packaging.
2. Remove any protective covers or protective caps present from the sensor.
3. Remove stick-on label on the electronics compartment cover.