
Maintenance
Liquistation CSF33
6
Hauser
1.
Remove the clamp (item 8) and remove the pump tube (item 2) from the pump.
2.
Remove any silicone deposits on the roller (item 10) and the flexible pump bracket.
3.
Make sure the roller and all the rolls turn smoothly and evenly.
4.
Apply some lubricant to the roller.
5.
Secure the new pump tube to the pressure sensor with the clamp (item 8).
6.
Guide the pump tube around the roller and insert the marking ring into the groove (item 9), see
7.
Close the pump head cover and screw it tight. Close the pump bracket.
8.
Under Menu/Diagnostics/Term information/Pump tube life reset the tube life to zero by
selecting "Reset".
Calibrate the sample volume each time you replace a pump tube. --> See Operating Instructions
BA489C "Calibration".
NOTICE
Incorrect sample volume
►
Only reset the tube life counter to zero once you have successfully replaced the pump tube in order
to avoid incorrect dosing of the medium.
a0014116
Fig. 2: Replacing the pump tube
1
2
8
9
10
Retainer
Pump tube
Clamp
Marking ring
Roller
1
2
1
8
9
10
Содержание Liquistation CSF33
Страница 41: ...Liquistation CSF33 Spare parts Endress Hauser 41...
Страница 43: ...Liquistation CSF33 Endress Hauser...
Страница 44: ...BA488C 07 EN 14 11 71134632 FM...