Deltabar PMD78B HART
Commissioning
Hauser
51
9.6.4
Commissioning with the Commissioning wizard
In FieldCare, DeviceCare
, SmartBlue and on the display, the
Commissioning
wizard is
available to guide the user through the initial commissioning steps. Commissioning is also
possible via AMS or PDM.
1. Connect the device with FieldCare or DeviceCare.
2. Open the device in FieldCare or DeviceCare.
The dashboard (homepage) of the device is displayed:
3. In the
Guidance
menu, click the
Commissioning
wizard to open the wizard.
4. Enter the appropriate value in each parameter or select the appropriate option. These
values are written directly to the device.
5. Click "Next" to go to the next page.
6. Once all the pages have been completed, click "End" to close the
Commissioning
wizard.
If the
Commissioning
wizard is cancelled before all the necessary parameters have
been configured, the device may be in an undefined state. In such situations, it is
advisable to reset the device to the factory default settings.
1)
DeviceCare is available for download at www.software-products.endress.com. You must register in the Hauser software portal to
download the product.