Maintenance
CA76NA
58
Hauser
A0049174
15
Connected bottle for sodium standard solution, including head
Do not touch the hoses when changing the standard solution.
1. Switch off the automatic mode via
Maintenance
/
Operating Mode
/
Mode
=
Off
.
The device stops the program currently running. The analyzer is in the standby
mode.
2. Unscrew the standard solution bottle from the head.
3. Carefully remove the standard solution bottle towards the bottom.
4. Screw the new bottle containing the standard solution into the head provided, while
making sure not to touch the hose.
5. If larger containers of the standard solution have been purchased, top up the bottle
with 0.5 liter (16.9 fl.oz) of standard solution (5100 µg/l (ppb) Na
+
) and screw it
back into the holder.
6. Under
Maintenance
/
Reagent Exchange
, select the
Yes
option.
7. After replacing, execute the "Fill" sequence under
Maintenance
/
Operating Mode
/
Manual
. There should not be any air in the pipe system after replacing the solution.
This would cause inaccuracies during the calibrations and measured errors during the
subsequent measurements.
This completes the process of replacing the standard solution.
Replacing the alkalization reagent
L
WARNING
Diisopropylamine is a hazardous substance and can cause serious injuries.
‣
Wear protective goggles, protective gloves and a lab coat when working with chemicals.
‣
Avoid all contact with the skin.
‣
Do not inhale any vapors.
‣
Comply with the manufacturer's instructions in the safety data sheets.
Содержание CA76NA
Страница 2: ......
Страница 71: ......
Страница 72: ...www addresses endress com 71578460 71578460...