Figure 3-2: Exploded View
A. Vent cap
B. 3/32 in. socket grub screws
C. Protector cap
D. Purge vent
E. O-ring
The protector cap (
Figure 3-2
, C) must be removed from the purge vent (D) and replaced
with the vented cap (A) supplied with the unit.
NOTICE
On/Off circuit breakers
There are no
On/Off
switches on the analyzer. The application of electrical power to the
analyzer is controlled through two external circuit breakers.
Both external circuit breakers are simple 2-pole on/off circuit breakers. Both must be set to
On
to permit the safe operation of the analyzer.
Operation of the analyzer is controlled primarily through the display controller.
Refer to
Figure 3-3
.
Operating the analyzer
Quick Start Guide
August 2018
D-7010-0055
36
Rosemount
™
CT5100 Ex
Содержание Rosemount CT5100 Ex
Страница 1: ...Quick Start Guide D 7010 0055 Rev C August 2018 Rosemount CT5100 Ex Continuous Gas Analyzer ...
Страница 12: ...Contents Quick Start Guide August 2018 D 7010 0055 12 Rosemount CT5100 Ex ...
Страница 34: ...Install Quick Start Guide August 2018 D 7010 0055 34 Rosemount CT5100 Ex ...
Страница 44: ...Operating the analyzer Quick Start Guide August 2018 D 7010 0055 44 Rosemount CT5100 Ex ...
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......