Table 2-1: Main Items of the Rosemount CT5100(Ex) Installation
(continued)
Item
Name or
description
Supplied by
Part number
Quantity
Notes
13
Secondary circuit
breaker
Customer
Customer choice
2.2
Gas inputs and outputs
About this task
The analyzer has two gas inputs and one gas output. See
Figure 2-2
.
Procedure
1. The gas sample that is to be measured for impurities enters the analyzer through
the sample gas input port located on top of the analyzer (see
Figure 2-2
, Items A
and B).
2. Once the gas sample has been examined for impurities, it is expelled from the
analyzer through the sample gas return port (A).
Quick Start Guide
Install
D-7010-0055
August 2018
Quick Start Guide
25
Содержание Rosemount CT5100 Ex
Страница 1: ...Quick Start Guide D 7010 0055 Rev C August 2018 Rosemount CT5100 Ex Continuous Gas Analyzer ...
Страница 12: ...Contents Quick Start Guide August 2018 D 7010 0055 12 Rosemount CT5100 Ex ...
Страница 34: ...Install Quick Start Guide August 2018 D 7010 0055 34 Rosemount CT5100 Ex ...
Страница 44: ...Operating the analyzer Quick Start Guide August 2018 D 7010 0055 44 Rosemount CT5100 Ex ...
Страница 80: ......
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......