Appendix B:
checklists
The checklists listed in this section provide support during the planning, assembly and
electrical installation, startup, parameterization, and validation of the IC220SDL963
module.
Important
These checklists may be used as planning documentation and/or as verification to ensure
the steps in the specified phases are carried out carefully.
Archive the completed checklists to use as reference for recurring tests.
The checklists do not replace the validation, initial startup, and regular testing performed
by qualified personnel.
The following section of a checklist shows an example of a completed checklist.
Checklist . . .
Device type/equipment identification
IC220SDL963/Node1
Version: HW/FW/FW
AA (00/100/100)
Date
2011-03-01
Author
John Smith
Test engineer
Jane Brown
Remark
System XXX has been checked for engine hood production
No. Requirement (mandatory)
Yes
Remark
X
. . .
No. Requirement (optional)
Yes No
Remark
Y
. . .
Key:
Equipment
identification
Enter the device type and/or the equipment identification for the
relevant device.
Version: HW/FW/FW
Enter the hardware and firmware version of the device (see "Structure of
the safety module" on page 8).
Date
Enter the date on which you began to fill in this checklist.
Author/Test
engineer
Enter the names of the author and the test engineer.
Remark
Enter a remark, if necessary.
Requirement
(mandatory)
These requirements must be met for a safety application, in order to
complete the relevant phase using the checklist.
Requirement
(optional)
These requirements are optional. For points that are not met, please
enter an appropriate remark in the relevant field.