S600+ Instruction Manual
Revised July-2017
Installation
2-13
Figure 2-14. Clamps on I/O Module Wiring
7.
Attach a large ferrite clamp onto the wiring to the CPU’s power
connections and one medium clamp to the COM3 and COM 4
connections (see
Figure 2-15
).
Figure 2-15. Clamps on CPU Module Power & COM Connections
Large
ferrite
clamps
Large
ferrite
clamp
Medium
ferrite
clamps
Medium
ferrite
clamp
25-way
EMISTOP
37-way
EMISTOP
Содержание FloBoss S600+
Страница 55: ...S600 Instruction Manual Revised July 2017 I O 4 17 Figure 4 20 Prover Module P154 Figure 4 21 Prover Module ...
Страница 66: ...S600 Instruction Manual 4 28 I O Revised July 2017 This page is intentionally left blank ...
Страница 84: ...S600 Instruction Manual 5 18 Front Panel Revised July 2017 This page is intentionally left blank ...
Страница 92: ...S600 Instruction Manual 6 8 Webserver Access Revised July 2017 This page is intentionally left blank ...
Страница 114: ...S600 Instruction Manual A 8 Glossary Revised July 2017 This page is intentionally left blank ...
Страница 122: ...S600 Instruction Manual B 8 Front Panel Navigation Revised July 2017 This page is intentionally left blank ...
Страница 150: ...S600 Instruction Manual C 28 Chromatographs Revised July 2017 2350 USA 2551 USA ...