15
Installation and Operation Manual
Part Number: VA001-507-32, Rev. 1
August 2016
Section 2: Installation
Installation
Table 3.
Typical EHO Optional Accumulator System
Part Number
Part Name
A
Reservoirs
B
Accumulator
C
Nitrogen Relief Valve
D
3-way Isolation Valve
E
Isolation Valve (Accumulator Drain)
F
Isolation Valve (Nitrogen Blow Down and Fill)
G
Nitrogen Pressure Gauge
H
Nitrogen Gauge Isolation Valve
I
Speed Control
2.8.3 Pre-charge Verification
Check the nitrogen pre-charge in the accumulator periodically to ensure the accumula-
tor is at full potential. Follow the steps below and record final readings for reference.
a.
Shut off the hydraulic power supply to the accumulator.
b.
Ensure 3-way Isolation Valve (D) is turned fully counterclockwise.
c.
Slowly open Isolation Valve (Accumulator drain) (E) and drain all the
fluid back to the reservoir.
d.
Read the pressure at the nitrogen pressure gauge (G) and compare it to
the Oil/Temperature Chart shown on the General Assembly Drawing for
the job being checked.
e.
If the pre-charge is low, add nitrogen to increase the pressure to
the requirements listed on the GA Oil/Temperature Chart. See 2.8.2,
Accumulator Pre-charge, if the pre-charge is high relieve pressure to
equal the GA Oil/Temperature Chart.
f.
Record Information below.
g.
With bypass valve closed, reconnect the hydraulic power supply and
bring the accumulator back up to full pressure.
h.
Check the entire nitrogen circuit for leaks using a liquid leak detector
such as Snoop (manufactured by Swagelok). As the unit is self-contained,
only a zero leak rate is acceptable. Corrective action must be taken for
any leaks found.
WARNING:
This unit contains high-pressure hydraulic fluid and nitrogen gas. Exercise caution when
performing any type of maintenance. Wear proper safety attire and required personal
protective equipment, including safety glasses. Ensure the accumulator has been
drained of all hydraulic and nitrogen pressure before attempting any repair.