August 2016
Installation and Operation Manual
Part Number: VA001-507-32, Rev. 1
26
Section 4: Set-up/Start-up Procedure
Set-up/Start-up Procedure
4.5.1
Rotate both Hand Pump Isolation Valves (O) to the downward horizontal
position.
4.5.2 Select and push inward the open or close knob located on the Hand Pump
Selector Manifold (L).
4.5.3 Use supplied Hand Pump Handle to discharge hydraulic fluid into the open or
close side of the actuator cylinder.
4.5.4 Once the actuator is fully stroked and makes contact with the actuators
adjustable stops, observe if any leakage is detected at any tube fittings or port
connections from the Hand Pump to the Actuators operating ports.
4.5.5 Push the Pump By-Pass Valve located on the top of the Hand Pump Selector
Manifold (L) and pull the pump handle downward retracting the pump ram into
the pump body.
4.5.6 Select and push inward the opposite open or close knob located on the Hand
Pump Selector Manifold (L).
4.5.7 Repeat steps 4.5.3 thru 4.5.5
4.5.8 Rotate both Hand Pump Selector Valves (M) back into the upward vertical
position.
4.6
Check Rotation
NOTE:
The components referenced below are referencing to schematic found in section 10.2.
and is for illustration purposes only. When using this procedure refer to the Bettis EHO
Actuator General Arrangement Drawing and Hydraulic Schematic for the unit being
worked on.
4.6.1
Turn on the electrical supply to the unit. If an ((optional)) Circuit Breaker Module
is supplied, turn the Circuit Breaker to ON.
4.6.2 Turn the LOCAL-OFF-REMOTE selector switch to LOCAL.
4.6.3 Ensure Flow Control Valves (V) are adjusted fully counterclockwise for maximum
flow.
4.6.4 Open inspection port on side of unit to observe the rotation of the motor/pump
shaft.
Figure 18
Inspection Port for Motor Rotation