14
August 2016
Installation and Operation Manual
Part Number: VA001-507-32, Rev. 1
Section 2: Installation
Installation
NOTE:
Recheck the pre-charge pressure after a time interval sufficient to insure the nitrogen
pressure is equal to the ambient temperature (a minimum of 4 hours). Adjust the
pre-charge pressure as required to conform to the Pressure versus Temperature graph.
g.
After the nitrogen filling is complete, close the Isolation Valve (F)
(Nitrogen Blow Down and Fill).
h.
Disconnect the nitrogen supply and remove the female pipe adaptor
from Isolation Valve (F).
i.
Install the straight thread plug and O-ring, shipped as an accessory, into
Isolation Valve (F).
NOTE:
The straight thread plug must be installed, after filling is complete, to prevent
accidental leakage of nitrogen from Isolation Valve (25).
j.
Close Isolation Valve (24).
Figure 7
Typical EHO Optional Accumulator System
A
B
C
D
E
F
G
H
I
Содержание Bettis EHO