Figure 3 Attaching an inner rail to the server
CL4891
1
2
Installing the slide rails in the cabinet
The universal rail assemblies for this server support cabinets in which the front and rear
mounting channels are 24 inches to 34 inches apart. Each assembly contains a right and
a left slide rail.
Install each slide rail in the cabinet using the procedure that follows.
Procedure
1. From the front of the cabinet, align rail alignment posts with the rear channel holes for
the selected 1 U (1.75 in) cabinet space for the server, and insert the alignment posts
securely into the holes (
).
An audible click indicates that the connection is secure.
8
EMC SVR-I1U-1304 Server Installation and Maintenance Guide