EMC CX200-Series DPE2 Hardware Reference
vi
Contents
Making Management LAN Connections ............................ 2-12
DPE2 Powerup and Initialization................................................ 2-14
CX200-Series Powerdown ............................................................ 2-15
Turning Off the Power ........................................................... 2-15
Servicing and Upgrading a CX200-Series DPE2
Monitoring CX200-Series Status .................................................... 3-2
Handling FRUs ................................................................................ 3-5
Power Issues and FRUs ........................................................... 3-5
Avoiding Electrostatic Discharge (ESD) Damage ................ 3-6
Emergency Procedures (Without an ESD Kit)...................... 3-7
Precautions When Removing, Installing, or Storing FRUs 3-8
Replacing or Adding a Disk Module ............................................ 3-9
Unlocking and Removing the Front Bezel ......................... 3-10
Removing a Disk Filler Module ........................................... 3-11
Removing a Disk Module...................................................... 3-11
Installing a Disk or Filler Module ........................................ 3-12
Installing and Locking the Front Bezel................................ 3-14
Replacing a Storage Processor (SP) ............................................. 3-15
Removing an SP...................................................................... 3-15
Installing an SP ....................................................................... 3-16
Replacing a Power Supply/System Cooling Module .............. 3-18
Removing a Power Supply/System Cooling Module ...... 3-18
Installing a Power Supply/System Cooling Module or
Blower Module ....................................................................... 3-20
The Standby Power Supply (SPS)
About the SPS................................................................................... 4-2
Technical Specifications and Operating Limits
CX200-Series DPE2 Technical Specifications ............................. A-2
Operating Limits ............................................................................ A-6
SPS Technical Specifications ......................................................... A-7
Operating Limits...................................................................... A-8
........................................................................................................................ g-1
................................................................................................................................ i-1
Содержание CX200-Series
Страница 4: ...EMC CX200 Series DPE2 Hardware Reference iv ...
Страница 42: ...2 18 EMC CX200 Series DPE2 Hardware Reference Installing a CX200 Series DPE2 ...
Страница 64: ...3 22 EMC CX200 Series DPE2 Hardware Reference Servicing and Upgrading a CX200 Series DPE2 ...
Страница 80: ...A 12 EMC CX200 Series DPE2 Hardware Reference Technical Specifications and Operating Limits ...
Страница 86: ...g 6 EMC CX200 Series DPE2 Hardware Reference Glossary ...