Installation
page 60
ELTROPLAN-REVCON
5
Commissioning
Stop!
Prior to initial switch-on of the power feedback unit check the wiring for com-
pleteness, short-circuit and earth fault.
Stop!
If the wiring is not correct, a non-intended operation of controller and/or power
feedback unit is possible.
5.1
First powering up
1.
Switch on mains supply :
- The power feedback unit is ready for operation after ca. 1s
2.
Check the readiness for service of the power feedback unit:
– If only the green LED is on:
power feedback unit is ready for service.
– If beside the green LED also other LED’s are on:
A disturbance is present. Before proceeding with commission-
ing, re
move the disturbance (refer to chapter 7 "Troubleshoot-
ing”).
3.
Check the readiness for service of the controller:
– Proceed in accordance with the controller manual.
STOP
STOP