2. Connect the sensor cables to terminals 5-6 / 7-8 (Fig. Z, page 31) as shown in the following table.
Meter type
Sensor
marking
Terminal
Installation position
Energy meter in
cold pipe
Red
5 T
Hot
6
In the hot pipe
Blue
7 T
Cold
8
In the meter
Energy meter in hot
pipe
Red
5 T
Hot
6
In the meter
Blue
7
T
Cold
8
In the cold pipe
Cooling meter in
hot pipe
Blue
7 T
Cold
8
In the cold pipe
Red
5 T
Hot
6
In the meter
Cooling meter in
cold pipe
Blue
7 T
Cold
8
In the meter
Red
5 T
Hot
6
In the hot pipe
Heat Meter with
cooling tariff in cold
pipe
Red
5 T
Hot
6
In the hot pipe
Blue
7
T
Cold
8
In the meter
Heat Meter with
cooling tariff in hot
pipe
Red
5 T
Hot
6
In the meter
Blue
7 T
Cold
8
In the cold pipe
The programmed installation position is shown in the information loop (loop 3, “hot pipe” or “cold
pipe”).
Fig. Z
Terminals for temperature sensors
3. Press the sensor cables into the strain relief.
4. Close the top part with the bottom part.