P 2500 - P 5000
34
Drawing 21
Due to the additional load of the swinging support, the number of balancing
springs has to be adjusted. Install the correct number of balancing springs
depending on the boom length according to the table on page 29.
7.9.2
Fixed support P 4000 - P 5000
1. Mount the fixed support on a suitable foundation.
2. Observe the alignment and the distance to the barrier (see drawing below).
3. Mount the fixed support on the foundation.
4. Pay attention to the following points during installation. When the barrier is
closed:
a. the barrier boom has to be positioned in the middle of the support fork.
b. the profile end of the barrier boom must not protrude beyond the
support fork.
c. the barrier boom remains approx. 0.8-1.2in above the rubber insert.
Содержание P 2500
Страница 14: ...P 2500 P 5000 13 4 Declaration of incorporation Drawing 2 ...
Страница 20: ...P 2500 P 5000 19 7 2 Mounting dimensions Drawing 3 ...
Страница 47: ...P 2500 P 5000 46 8 4 Circuit diagram Drawing 34 ...
Страница 48: ...P 2500 P 5000 47 Drawing 35 ...
Страница 49: ...P 2500 P 5000 48 Drawing 36 ...
Страница 50: ...P 2500 P 5000 49 Drawing 37 ...
Страница 51: ...P 2500 P 5000 50 Drawing 38 ...
Страница 52: ...P 2500 P 5000 51 Drawing 39 ...
Страница 55: ...P 2500 P 5000 54 10 Layout exploded drawing Drawing 41 ...