5.2
Installation and operation
5.1.1 Commissioning
Before you operate the new EN series compressor for the
first time, install it at your site according to ELGi’s
Installation specifications.
For safe operation of the compressor, the servicing
technician performs a series of checks on the compressor
and the systems to which the compressor connects. The
technician will explain to the compressor operator how to
operate and maintain the equipment. This procedure is
referred to as the commissioning process.
The commissioning of your compressor is a necessary
safety step. The general operating conditions of the
equipment, including the cleanliness of the ambient
atmosphere, the temperature and ventilation, are checked.
Technical details relating to your system, such as
particulars of your electrical installation, are verified. The
commissioning process includes familiarizing your
compressor operator with all aspects of the compressor’s
normal running and dealing with unusual situations.
Please make preparations according to the instructions
provided in the Installation section for your EN Series
compressor to be commissioned. Ensure that the location
chosen meets the requirements of accessibility,
ventilation, and safety. Provide electrical power as
recommended in the Installation section. Select air pipe
lines and receivers for your system according to the tables
provided in the same section.
After completing the commissioning process, the
technician will fill in the commissioning report and the
warranty card.
5.1.2 Unpacking
Unpack the compressor from the packing case by
removing the nails or pins. Unscrew the bolts as you hold
the compressor to the base of the crate.
Once you have separated the packing material, check the
contents against the packing list. The compressor ships
with the following items:
The key to doors
The operation and maintenance manual
A checklist of parts of the machine
An electrical drawing
Tools may be provided on request. If any components are
missing, contact ELGi immediately.
5.1.3 Handling
If the compressor consists of a lifting bail, then use only
the bail to lift the bail machine. If no bails exist, lift the
bail machine using slings. Always use slings and not the
lifting bail to airlift compressors by helicopter.
Prior to lifting, inspect the lifting bails and points of
attachment for cracked welds; for cracked, bent,
corroded or otherwise degraded members; and for loose
bolts and nuts.
Make sure the entire lifting, rigging, and supporting
structure has been inspected, is in good condition, and
has a rated capacity of at least the net weight of the
Installation and commissioning
5.1
Figure 2. Lifting using crane
STIFF SPREADER BAR
ROPE / SLING
NOTE
Removal of transit brackets:
Once the compressor settles down in its final position, re-
move the red painted transit bushes and store for future
use.
Locations:
Bushes in between the base and structure
NOTE
Ensure belt tension as per the drive table during
commissioning.
Figure 2.1 Lifting using Fork
Содержание EN 30X-100
Страница 1: ......
Страница 2: ......
Страница 3: ...Product Manual EN Series Electric Powered Screw Air Compressor EN 37 100 208 230 460V 3Ph 60Hz...
Страница 8: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 59: ...Controller Manual Neuron XT Version 3 0 January 2018...
Страница 80: ...7 22 Controller Manual Menu Structure...
Страница 81: ...PARTS MANUAL EN SERIES ELECTRIC POWERED SCREW AIR COMPRESSOR EN 30X EN 37...
Страница 82: ...8 2 Parts Manual 8 0 Air inlet and control system Ref 015315272 X016550 21...
Страница 84: ...9 1 Parts Manual 9 0 Drive system Ref 015310622 X015310 EN 37 100 PSI...
Страница 86: ...10 1 Parts Manual 10 0 Discharge system Ref 015310612 X015300 EN 30 EN 37...
Страница 88: ...11 1 Parts Manual 11 0 Cooling system Ref 015310616 X015304 EN 37...
Страница 90: ...12 1 Parts Manual 12 0 Lubrication system Ref 015315274 X016552 EN 37...
Страница 92: ...13 1 Parts Manual 13 0 Base and canopy system Ref 015310618 X015306 EN 37...
Страница 96: ...12 3 Kit Details...
Страница 97: ...POWER CIRCUIT 8 3 1 0 6 2 2 2 9...
Страница 98: ...CONTROL CIRCUIT 6 2 1 8 0 3 2 2 9...
Страница 99: ...BOM 8 1 0 3 6 2 2 2 9...
Страница 100: ...PANEL LAYOUT 0 2 6 3 1 8 2 2 9...
Страница 101: ...POWER CIRCUIT 8 3 1 0 6 2 2 2 9...
Страница 102: ...CONTROL CIRCUIT 6 2 1 8 0 3 2 2 9...
Страница 103: ...BOM 8 1 0 3 6 2 2 2 9...
Страница 104: ...PANEL LAYOUT 0 2 6 3 1 8 2 2 9...
Страница 107: ......
Страница 108: ......