6.10
Maintenance
6.1.10 Belt maintenance
The belts must be tensioned regularly in order to avoid
compressor efficiency loss, belt slippage, and belt failures.
The belts are re-tensioned once every 2000 hrs.
To tension the belt:
Switch off and isolate the machine from the service line.
Isolate the machine from power supply.
Unlock and remove the belt guard, rear panel, and
motor side panel.
Do not tension belts when hot. Let them cool down to
<140°F (60°C) before performing belt maintenance.
Loosen the lock nut mounted in the belt tension bolt.
Screw the tension bolt clockwise.
Check the belt tension.
Tighten the lock nut.
Switch on the machine and verify running.
6.1.11 Belt replacement
To replace belts:
Switch off and isolate the machine from the service line.
Isolate the machine from power supply.
Unlock and remove the belt guard, rear panel, and
motor side panel.
Loosen the lock nut in the belt tension bolt.
Screw the belt tension bolt counterclockwise for five
revolutions.
Remove the old belts.
Remove and inspect the grooves for wear and tear.
Check the new belts to see if they are cracked or
damaged. If ok, place the new belts in pulleys without
damaging the belt.Tighten the tensioning bolt.
Check the belt tension. Increase the tension if required.
Tighten the lock nut.
Switch on the machine and verify that the belt runs
without wobbling.
Let the machine run for 30 minutes.
Switch off the machine and allow the belts to cool
sufficiently.
Check the belt tension again.
Repeat the belt tensioning procedure to set the belts up
to the required static belt tension as specified in the
drive table .
Procedure for assembling taper lock bush
Step
1
Clean and de-grease the bore and taper surfaces
of the bush and the tapered bore of the pulley.
Insert the bush in the pulley hub and line up the
holes. (Half thread holes must line up with half
straight holes.)
Step
2
Lightly oil the grub screws and screw them; do
not tighten yet.
Step
3
Clean and de-grease the shaft. Fit the pulley by
using the taper bush on the shaft and place it in
the desired position.
Step
4
When using a key, it should be first fitted in the
shaft keyhole. There should be a top clearance
between the key and the keyhole in the bore of
the bushing.
Step
5
Using the proper hexagon socket wrench,
gradually tighten the grub screws in accordance
with the torques as listed in the table below.
Step
6
When the drive has been operating under Step
load for a short period (half to one hour), check
and ensure that the screws remain at the
appropriate tightening torque.
Step
7
Fill the empty holes with grease in order to
remove dirt.
Torque values for taper lock bushes
Taper
lock
bush
number
Grub screw
used
Qty
Torque value
(lb. Ft)
1008
1108
1/4” BSW
2
14.1
1310
1315
3/8” BSW
2
14.8
1210
1215
3/8” BSW
2
14.8
1610
1615
3/8” BSW
2
14.8
2012
7/16” BSW
2
22.9
1610
1615
1/2” BSW
2
35.5
Содержание EN 30X-100
Страница 1: ......
Страница 2: ......
Страница 3: ...Product Manual EN Series Electric Powered Screw Air Compressor EN 37 100 208 230 460V 3Ph 60Hz...
Страница 8: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 59: ...Controller Manual Neuron XT Version 3 0 January 2018...
Страница 80: ...7 22 Controller Manual Menu Structure...
Страница 81: ...PARTS MANUAL EN SERIES ELECTRIC POWERED SCREW AIR COMPRESSOR EN 30X EN 37...
Страница 82: ...8 2 Parts Manual 8 0 Air inlet and control system Ref 015315272 X016550 21...
Страница 84: ...9 1 Parts Manual 9 0 Drive system Ref 015310622 X015310 EN 37 100 PSI...
Страница 86: ...10 1 Parts Manual 10 0 Discharge system Ref 015310612 X015300 EN 30 EN 37...
Страница 88: ...11 1 Parts Manual 11 0 Cooling system Ref 015310616 X015304 EN 37...
Страница 90: ...12 1 Parts Manual 12 0 Lubrication system Ref 015315274 X016552 EN 37...
Страница 92: ...13 1 Parts Manual 13 0 Base and canopy system Ref 015310618 X015306 EN 37...
Страница 96: ...12 3 Kit Details...
Страница 97: ...POWER CIRCUIT 8 3 1 0 6 2 2 2 9...
Страница 98: ...CONTROL CIRCUIT 6 2 1 8 0 3 2 2 9...
Страница 99: ...BOM 8 1 0 3 6 2 2 2 9...
Страница 100: ...PANEL LAYOUT 0 2 6 3 1 8 2 2 9...
Страница 101: ...POWER CIRCUIT 8 3 1 0 6 2 2 2 9...
Страница 102: ...CONTROL CIRCUIT 6 2 1 8 0 3 2 2 9...
Страница 103: ...BOM 8 1 0 3 6 2 2 2 9...
Страница 104: ...PANEL LAYOUT 0 2 6 3 1 8 2 2 9...
Страница 107: ......
Страница 108: ......