TSE-P 04.00 EB
13/50
599 34 22-16
SE Movement:
VT movement during rinses in "jetsystem
total exchange" COTTON programmes (virtual tank):
During these phases, in which the motor rotates at high speed, if the electronic pressure switch detects that
the water in the tub falls below a certain level, the following operations are performed:
spin at 470 rpm (VT_MOV_CODE) to remove the water from the fabrics and therefore to increase the
level in the tub.
5 seconds pause, during which the level is again checked and, if necessary, the solenoid valve is
activated in order to load water until the level is correct.
energetic movement (E) (with the circulation pump in operation).
These operations may be repeated up to a maximum of three times for each rinse.
The parameters of the different programmes (levels, movements) vary according to the motor power supply
system of the different models:
AC motor
DC motor