Application manual
Presence / movement sensors EK-DF2/DG2-TP
Rev. 1.2 - 2020-02-06
MAEKDF2DG2TP_EN
© Ekinex S.p.A.
– All rights reserved
Pag. 11
Warning:
Before extracting the last part of the sensor body, please hold both spring clips with
a hand. Take extreme care of preventing the clips to jump back and harm your hand
holding the sensor!
10
Connection of the KNX bus line
The connection of the KNX bus line is made through the terminal block included in delivery and
inserted into the slot of the housing
.
11
Configuration and commissioning
Nota: The configuration and commissioning of KNX devices require specialized skills.
To acquire these skills, you should attend the workshops at KNX certified training
centers.
Con
figuration and commissioning of the device require the use of the ETS® (Engineering Tool
Software) program V4 or later releases. These activities must be carried out according to the design
of the building automation system done by a quali
fied planner.
For the con
figuration of the device parameters the corresponding application program or the whole
ekinex® product database must be loaded in the ETS program.
For detailed information on con
figuration options, refer to the application manual of the device
Code
Application program
(## = release)
EK-DF2-TP
APEKDF2TP##.knxprod
EK-DG2-TP
APEKDG2TP##.knxprod
For the commissioning of the device the following activities are required:
•
make the electrical connections as described above;
•
turn on the bus power supply;
•
switch the device operation to the programming mode by pressing the programming
pushbutton; the blue programming LED (visible through the device lens) turns ON;
•
download into the device the physical address and the con
figuration with the ETS program;
•
at the end of the download, the operation of the device automatically returns to normal mode.
During the programming process, the programming LED is turned o
ff.
Now the bus device is programmed and ready for use.
i