
– 31 –
2
I
NSTALLING
THE
S
WITCH
S
ELECTING
A
S
ITE
Switch units can be mounted in a standard 19-inch equipment rack or on a flat
surface. Be sure to follow the guidelines below when choosing a location.
◆
The site should:
■
be at the center of all the devices you want to link and near a power
outlet.
■
be able to maintain its temperature within -25 to 60 °C (-13 to 140 °F)
and its humidity within 10% to 90%, non-condensing
■
provide adequate space (approximately two inches) on all sides for
proper air flow
■
be accessible for installing, cabling and maintaining the devices
■
allow the status LEDs to be clearly visible
◆
Make sure twisted-pair cable is always routed away from power lines,
fluorescent lighting fixtures and other sources of electrical interference,
such as radios and transmitters.
◆
Make sure that the unit is connected to a separate grounded power outlet
that provides 100 to 240 VAC, 50 to 60 Hz, is within 2 m (6.6 feet) of each
device and is powered from an independent circuit breaker. As with any
equipment, using a filter or surge suppressor is recommended.
Содержание ECS4810-12M
Страница 1: ...Installation Guide www edge core com 12 Port Gigabit Ethernet Switch ECS4810 12M ...
Страница 2: ......
Страница 4: ......
Страница 14: ...COMPLIANCES AND SAFETY STATEMENTS 14 ...
Страница 20: ...TABLES 20 ...
Страница 22: ...FIGURES 22 ...
Страница 44: ...CHAPTER 2 Installing the Switch Connecting to the Alarm Port 44 ...
Страница 52: ...CHAPTER 3 Making Network Connections Cable Labeling and Connection Records 52 ...
Страница 56: ...APPENDIX A Troubleshooting In Band Access 56 ...
Страница 72: ...GLOSSARY 72 ...
Страница 75: ......
Страница 76: ...ECS4810 12M E082011 DT R01 xxxxxxxxxxxxx ...