INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Pellet boiler Bisolid OM-PBBV02/07/2017/EN
26
Do not put flammable materials over pellet boiler’s top side or near it within
the safety distance.
The requirements for installation and operation of transport fuel auger from
the fuel hopper to burner’s main module are given in its manual for
installation, operation and maintenance.
5.4.
METHODIC FOR INSTALLATION OF BOILER
After the hot water boiler from series Bisolid has been positioned it must be connected to the
heating installation and to the chimney by observing the relevant requirements. For correct
and reliable operation it is required to level the boiler horizontally, which will ensure its
reliable air freeing.
5.4.1.
CONNECTION TO A CHIMNEY
After installation and ground leveling of the boiler it must be connected to a chimney, by
observing the requirements for effective and reliable operation of the system.
Figure 5.1. Rear side view of hot water pellet boiler from series Bisolid.
Muff – circulations water inlet
Muff – circulations water outlet
Flue gas outlet pipe