INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Pellet boiler Bisolid OM-PBBV02/07/2017/EN
32
5.4.9.
MOUNTING OF THE COVER OVER THE BOILER’S COMBUSTION CHAMBER
This cover is equipped with isolating plane, designated for operation under
high temperatures in the boiler’s combustion chamber.
Figure 5.10. Directing cover over the boiler’s combustion chamber.
The directing cover over the boiler’s convection tract and directing cover over
the boiler’s combustion chamber are different and their positions must not be
changed.
5.4.10.
CONNECTING THE PELLET BURNER TO THE BOILER
On the rear side of the boiler’s side cover are installed connectors for connecting to: the
power supply, the pellet burner with manually mechanically cleaning from series Bisolid GP
xx_B hc> and room thermostat. Depending on right or left mounting of the burner the
connectors are positioned on the adjacent side cover panel of the boiler.
These connection’s connectors are equipped with component that prevents
from disconnecting and it must be released.