![Eco Power Equipment IAQH Series Скачать руководство пользователя страница 45](http://html1.mh-extra.com/html/eco-power-equipment/iaqh-series/iaqh-series_installation-and-user-instructions-manual_3999244045.webp)
IAQH-1000 Manual
iii.
Installation of IAQH
Required tools:
●
Multimeter
●
Combustion Analyzer
●
2 x Manometer (s)
●
Basic Hand Tools Including: Screwdrivers, Wrenches, Pipe Wrenches
These instructions have been thoroughly written, but they cannot cover every particular
installation and contingency. Therefore, if there is any doubt as to the interpretation of any
requirements, contact your local authority having jurisdiction, your local dealer, or Eco Power
Equipment Ltd.
Read and understand this manual and its safety instructions before using this product. Failure to
do so can result in serious injury or death.
1. The installation shall conform with local codes, or, in the absence of local codes, with the
National Gas and Propane Installation Code, CSA B149.1 or the National Fuel Gas Code,
ANSI Z223.1/NFPA 54.
2. When firing the unit in an enclosed area, ensure fresh air supply to the unit is possible
and that the enclosed area is not under negative pressure.
3. Do not operate the unit in partly ventilated areas without a flue pipe connected to the
unit.
4. Do not operate the unit in close proximity to combustible materials, surfaces, gasoline,
and other flammable vapours and liquids.
5. Install the unit on a level surface with duct connectors facing the target heating area;
a. Ducting is 24” on the outlet, and 20” on the return air side, ducting should be
rated for 150 °C or 302 °F minimum on the outlet, and appropriately for the
return air inlet
b. The maximum rated length of the duct system is 200 feet or 60 m, and this
represents the total duct amount, divided between the supply and return
portion of the heater.
6. Ensure the unit has the minimum clearance around the perimeter of the machine as
described in Section 4.2.2. — more room on the control panel and burner access door to
allow easy access to the control panel and burner system for routine inspection and
maintenance is recommended.
45
Содержание IAQH Series
Страница 2: ...2 Eco Power Equipment Ltd ...
Страница 21: ...IAQH 1000 Manual 21 ...
Страница 22: ...IAQH 1000 Manual 22 ...
Страница 50: ...IAQH 1000 Manual Gas Connection and Burner Setup FIgure GT1 50 ...
Страница 56: ...IAQH 1000 Manual Figure RTC Figure Midco 1 56 ...
Страница 57: ...IAQH 1000 Manual Figure RTC 2 57 ...
Страница 80: ...IAQH 1000 Manual Combustion Analysis O2 CO CO2 Efficiency Stack Temperature Ambient Temperature Excess Air 80 ...