![Eco Power Equipment IAQH Series Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/eco-power-equipment/iaqh-series/iaqh-series_installation-and-user-instructions-manual_3999244041.webp)
IAQH-1000 Manual
Fig. 5 -Vent installation shall confirm with local codes or in the absence of codes with the National Gas and Propane
Installation Code, CSA B149.1, CSA B149.3, or ANSI Z223.1/NFPA 5
1. Maximize the height of the vertical run of the vent pipe. A minimum of three feet
(0.91 m) of vertical pipe is required at the heater. The top of the vent must extend at
least three feet (0.91 m) above the highest point on the roof. A weatherproof vent cap
must be installed to the vent termination. Ensure there are no building air intake vents
or windows near exhaust venting system
41
Содержание IAQH Series
Страница 2: ...2 Eco Power Equipment Ltd ...
Страница 21: ...IAQH 1000 Manual 21 ...
Страница 22: ...IAQH 1000 Manual 22 ...
Страница 50: ...IAQH 1000 Manual Gas Connection and Burner Setup FIgure GT1 50 ...
Страница 56: ...IAQH 1000 Manual Figure RTC Figure Midco 1 56 ...
Страница 57: ...IAQH 1000 Manual Figure RTC 2 57 ...
Страница 80: ...IAQH 1000 Manual Combustion Analysis O2 CO CO2 Efficiency Stack Temperature Ambient Temperature Excess Air 80 ...