IAQH-1000 Manual
Exterior Mounted System:
This unit is designed to be mounted externally to the structure it is heating, following all
clearance distances found in Section 4.2.2. Ensure the unit is installed onto a non-combustible
surface.
To maximize heating system efficiency it is recommended to pull a portion of return air from the
structure. Note: Always set up your temporary heating system to overcome any negative building
pressure — this typically means having a portion of the heaters on side pulling fresh outside air
and forcing it into the structure during temporary heating.
The unit has not been designed to ingest wet or air containing rain or snow - ensure that inlet
ducting connections are solid and free from leaks that would allow the ingress of water or
debris.
It is recommended that if the heater is being used to draw fresh make up air, that external
filtration be provided to the inlet air, and that moisture limiting louvres are installed on the inlet
side of these filters.
43
Содержание IAQH Series
Страница 2: ...2 Eco Power Equipment Ltd ...
Страница 21: ...IAQH 1000 Manual 21 ...
Страница 22: ...IAQH 1000 Manual 22 ...
Страница 50: ...IAQH 1000 Manual Gas Connection and Burner Setup FIgure GT1 50 ...
Страница 56: ...IAQH 1000 Manual Figure RTC Figure Midco 1 56 ...
Страница 57: ...IAQH 1000 Manual Figure RTC 2 57 ...
Страница 80: ...IAQH 1000 Manual Combustion Analysis O2 CO CO2 Efficiency Stack Temperature Ambient Temperature Excess Air 80 ...