NOTICE
Proper maintenance is necessary with all battery powered floor machines.
Following the scheduled maintenance procedures found in your operation
manual will provide many years of uninterrupted service.
In addition to the scheduled maintenance procedures listed it is
recommended to have your machine serviced by certified service personnel
every three months. This service should include an emissions check.
Instructions For Use
Failure to read and understand this manual before operating this machine or performing service
on this machine may result in injury to the operator or nearby personnel or result in damage to the
machine or nearby property. Each operator must be trained in the operation of this machine before
being allowed to use it. Contact Amano Pioneer Eclipse Customer Service at 1-800-367-3550 or
+1-336-372-8080 or an authorized Amano Pioneer Eclipse Distributor to inquire about training or to
request a replacement manual.
Содержание PE300BU
Страница 1: ...UHS Battery Burnisher PE300BU Operator s Manual ...
Страница 2: ......
Страница 12: ...12 Controls and Instruments 2 4 7 3 1 5 6 2 1 3 4 Machine Components ...
Страница 25: ...25 Electrical Schematic Traction ...
Страница 26: ...26 Connections Traction ...
Страница 30: ...30 Main Bottom Assembly Traction RF044400 041713 5 12 3 2 7 6 9 10 13 14 14 13 12 12 4 1 11 14 13 12 8 ...
Страница 32: ...32 Main Rear Assembly RF044100 013113 5 6 7 7 6 5 4 2 7 6 5 3 1 10 11 12 14 13 20 21 17 18 16 19 15 9 8 6 ...
Страница 34: ...Main Top Assembly 34 RF049900 070914 10 4 5 6 7 11 9 8 1 2 3 22 19 18 26 17 20 21 24 25 23 16 15 12 14 13 27 ...
Страница 43: ......